Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING PRE-CONSTRUCTION
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/23/2011 | ENGINEERING PRE-CONSTRUCTION | Approved | 1) ADD TEMP SEDIMENT CONTROLS ALONG PERIMETER IN THE SOUTHEAST CORNER IN ORDER TO PREVENT DISTURBED SOIL FROM ENTERING THE PUBLIC DRAINAGE WAY. 2) PRIOR TO FINAL APPROVAL ENSURE AN ELEVATION CERT. FOR THE BLDG PAD IS SUBMITTED AND APPROVED BY THE COT. 3) PRIOR TO FINAL APPROVAL ENSURE A BASIN/DRAINAGE CERT STATEMENT FROM THE ENG/ARCH OF RECORD IS SUBMITTED AND APPROVED BY THE COT. 4) CALL FOR INSPECTION PRIOR TO PAVING. 5) CALL FOR INSPECTION FOR ANY SIGNIFICANT CHANGES TO THE APPROVED PLAN. |