Permit Details

Status:
C of o
Type:
COMMERCIAL ADDITION
Address:
260 S CHURCH AV
Address NEW:
260 S CHURCH AV
Apply Date:
09/09/2009
Applicant:
N/A
Description:
NEW ENTRY TO CONVENTION CENTER (EAST ENTRANCE)
Architects:
  • COHEN, HOWARD
Contractors:
  • GARFIELD TRAUB DEVELOPMENT *C* (DBA TURNER CONSTRUCTION COMPANY)

Permit Reviews

Permit Number - T09CM02434
Permit Status: C of o
Permit Description: NEW ENTRY TO CONVENTION CENTER (EAST ENTRANCE)
Start Date Submittal Complete Date Status  
09/09/2009 PLANS OK TO SUBMIT - COMM 09/09/2009 COMPLETED Review Details
09/09/2009 COMMERCIAL NEW 10/01/2009 COMPLETED Review Details
10/01/2009 COMMERCIAL NEW 11/03/2009 COMPLETED Review Details
12/29/2009 REVISION - - 1ST 12/29/2009 ACTIVE Review Details

Completed Inspections

Permit Status: C of o
Permit Number: T09CM02434
Permit Description: NEW ENTRY TO CONVENTION CENTER (EAST ENTRANCE)
Total Completed Inspections - 35
Date Description Inspector Results Comments
11/24/2009 MECHANICAL - HYDRONIC PIPING LHANLY Approved INSULATION TO FITTINGS @ VALVE VAULT OK. OK TO COVER.
12/02/2009 ELECTRIC - UFER LHANLY Approved 20' #6 CU WIRE INSTALLED AT 3 EACH LIGHT POLE BASES SE PARKING LOT.
12/04/2009 EXCAVATION/LAYOUT REBAR & ZON LHANLY Approved 4 EACH LIGHT POLE BASES N1/2 OF PK LOT
12/04/2009 ELECTRIC - UNDERGROUND RMORENO Approved 1) 1-1" PVC FOR POWER, 1-3/4 IN AND OUT FOR 11 POLE BASES OK
12/07/2009 ELECTRIC - PROGRESS HOLLANDER Approved
12/15/2009 FRAMING AQUIROZ Approved
12/22/2009 PLUMBING - GAS PRESSURE TEST RLEDONNE Approved 1) 1" GAS PIPING FROM TIE IN TO OUTSIDE TESTED AT 100 PSI. PROVIDE APPROVED PLAN FOR GAS PIPING
2) 8" ROOF DRAIN SOUTHWEST SIDE OF NEW ENTRY TEST OK ON PAGE P.1.1 STUB UP 5' AND OUT 5' ONLY
05/27/2010 SIGN - FINAL JYBARRA Approved
06/02/2010 RIGHT OF WAY - FINAL MOTERO Approved
06/02/2010 PLUMBING - FINAL RLEDONNE Approved IVRS - Inspection :*
06/02/2010 PLUMBING - INTERMEDIATE RLEDONNE Approved IVRS - Inspection :*
06/02/2010 PLUMBING - ABOVE CEILING RLEDONNE Approved IVRS - Inspection :*
06/02/2010 PLUMBING - ROOF DRAINS RLEDONNE Approved IVRS - Inspection :*
06/02/2010 PLUMBING - GAS PRESS TEST FNL RLEDONNE Approved IVRS - Inspection :*
06/03/2010 SHEET ROCK NAILING AQUIROZ Approved IVRS - Inspection :*
06/04/2010 MECHANICAL - FINAL LHANLY Approved
06/04/2010 MECHANICAL - ABOVE CEILING LHANLY Approved
06/04/2010 MECHANICAL - INTERMEDIATE LHANLY Approved
06/04/2010 PLUMBING - PROGRESS LHANLY Approved
06/04/2010 BUILDING ABOVE CEILING LHANLY Approved
06/04/2010 OUTDOOR LIGHTING FINAL LHANLY Approved
06/04/2010 ELECTRIC - OUTDOOR LIGHTING LHANLY Approved
06/07/2010 BUILDING - PROGRESS AQUIROZ Approved IVRS - Inspection :*
06/09/2010 STEM WALL/RETAINING WALL AQUIROZ Approved IVRS - Inspection :*
06/10/2010 ELECTRIC - FINAL RHOLLAND Approved IVRS - Inspection :*
1) OK ELECTRIC
2) RECEIVED GENERATOR REPORT
06/10/2010 ELECTRIC - TEMPORARY SERVICE RHOLLAND Approved IVRS - Inspection :*
06/10/2010 ELECTRIC - ABOVE CEILING RHOLLAND Approved IVRS - Inspection :*
06/10/2010 ELECTRIC - INTERMEDIATE RHOLLAND Approved IVRS - Inspection :*
06/30/2010 FIRE - FINAL DRamirez Approved Approved 6/30/10
07/02/2010 NPPO - FINAL LHANLY Approved
07/02/2010 FIRE - ALARM FINAL LTHOMAS Approved SEE CONCURRENT SPRINKLER PERMIT
07/02/2010 FIRE SPKLR - FINAL LTHOMAS Approved SEE CONCURRENT SPRINKLER PERMIT
07/02/2010 BUILDING - FINAL LHANLY Approved
07/09/2010 LANDSCAPE - FINAL MCARREON Approved ALL CORRECTIONS HAVE BEEN MADE.
07/09/2010 ENGINEERING - FINAL MCARREON Approved