Permit: T09BU01841
Permit Details
Apply Date:
12/16/2009
Applicant:
GRIZZLE, GARY LEWIS
Description:
GRADING FOR NEW SOFTBALL FIELD COMPLEX; T09CM03317
Architects:
- GRIZZLE, GARY LEWIS
Contractors:
- ANDERSON CONSTRUCTION CORP , M
Permit Reviews
Permit Number - T09BU01841
Permit Status: Final
Permit Description: GRADING FOR NEW SOFTBALL FIELD COMPLEX; T09CM03317
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
03/11/2010 | RESUBMITTAL - GRADING ALL | 03/18/2010 | ACTIVE |
12/16/2009 | PLANS OK TO SUBMIT - GRADING | 12/16/2009 | COMPLETED |
12/17/2009 | GRADING | 01/04/2010 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T09BU01841
Permit Status: Final
Permit Description: GRADING FOR NEW SOFTBALL FIELD COMPLEX; T09CM03317
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
12/16/2009 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: Final
Permit Number: T09BU01841
Permit Description: GRADING FOR NEW SOFTBALL FIELD COMPLEX; T09CM03317
Total Completed Inspections - 10
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/24/2010 | NPPO PRE PERMIT INSPECTION | DROBERTS | Approved | |
12/08/2010 | STORMWATER FOLLOW-UP INSP | DROBERTS | Approved | LOOKED AT THE SITE WITH JACK TODAY TO VERIFY THAT OVER 500 BARREL CACTUS HAVE BEEN RELOCATED TO THEIR FINAL LOCATION. GRADING HAS STARTED ALONG THE EXTERIOR AREAS OF THE GRADING LIMITS FOR THE INSTALLATION OF THE STORMWATER CONTROLS. THE CLEARING AND GRUBBING OF THE SITE WILL START IN THE NEXT 2 DAYS AND GRADING WILL FOLLOW AFTER THAT BY THE MIDDLE OF NEXT WEEK. |
12/08/2010 | GRADING - CHECK FOR ACTIVITY | DROBERTS | Approved | WALKED THE SITE WITH JACK AND LOOKED AT ALL OF THE TRANSPLANTING OF THE BARREL CACTUS THAT HAS TAKEN PLACE ON THIS SITE. THEY HAVE RELOCATED OVER 520 CACTUS ON THIS SITE EVEN THOUGH 490 WERE ONLY CALLED OUT ON THE PLANS. THE GRADING LAYOUT WAS STAKED PRIOR TO PERFORMING THE PLANT RELOCATIONS.. THIS CREW IS PLACING SOME OF THE STORMWATER CONTROLS IN SOME OF THE AREAS NOTED ON THE STORMWATER PLANS, THE REMAINING MATERIAL WILL BE PLACED AS AREAS ARE CLEARED. |
12/08/2010 | ENGINEERING PRE-CONSTRUCTION | DROBERTS | Approved | COMPLETED THE PRE-CON FOR THIS SITE. |
12/22/2010 | STORMWATER INSTALL OF CONTROLS | DROBERTS | Approved | ALL MATERIAL HAS BEEN INSTALLED ON THIS SITE, GRADING OF THE SITE HAS BEGUN AND WILL CONTINUE FOR THE NEXT 2 MONTHS. |
10/13/2011 | GRADING - INTERMEDIATE | DROBERTS | Approved | MET WITH JACK AND LOOKED OVER THE SITE TO SEE WHERE THEY ARE AT. I WILL PERFORM A FINAL GRADING INSPECTION ON MONDAY TO ENSURE THAT ALL OF THE ITEMS ARE COMPLETE PRIOR TO THE GRAND OPENNING ON WEDNESDAY. |
10/17/2011 | GRADING - REBAR | DROBERTS | Approved | |
10/17/2011 | GRADING - TIER REV | DROBERTS | Approved | |
05/13/2020 | LANDSCAPE INSPECTION | DROBERTS | Approved | THIS SITE APPEARS TO HAVE BEEN COMPLETED PER THE APPROVED PLANS WITHOUT THE FINAL INSPECTION |
05/13/2020 | GRADING - FINAL | DROBERTS | Approved | THIS SITE APPEARS TO HAVE BEEN COMPLETED PER THE APPROVED PLANS WITHOUT THE FINAL INSPECTION |