Permit Details

Status:
Final
Type:
Grading
Apply Date:
12/16/2009
Applicant:
GRIZZLE, GARY LEWIS
Description:
GRADING FOR NEW SOFTBALL FIELD COMPLEX; T09CM03317
Architects:
  • GRIZZLE, GARY LEWIS
Contractors:
  • ANDERSON CONSTRUCTION CORP , M

Permit Reviews

Permit Number - T09BU01841
Permit Status: Final
Permit Description: GRADING FOR NEW SOFTBALL FIELD COMPLEX; T09CM03317
Start Date Submittal Complete Date Status  
03/11/2010 RESUBMITTAL - GRADING ALL 03/18/2010 ACTIVE Review Details
12/16/2009 PLANS OK TO SUBMIT - GRADING 12/16/2009 COMPLETED Review Details
12/17/2009 GRADING 01/04/2010 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T09BU01841
Permit Status: Final
Permit Description: GRADING FOR NEW SOFTBALL FIELD COMPLEX; T09CM03317
Total Outstanding Activity Conditions - 1
Date Name
12/16/2009 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.

Completed Inspections

Permit Status: Final
Permit Number: T09BU01841
Permit Description: GRADING FOR NEW SOFTBALL FIELD COMPLEX; T09CM03317
Total Completed Inspections - 10
Date Description Inspector Results Comments
11/24/2010 NPPO PRE PERMIT INSPECTION DROBERTS Approved
12/08/2010 STORMWATER FOLLOW-UP INSP DROBERTS Approved LOOKED AT THE SITE WITH JACK TODAY TO VERIFY THAT OVER 500 BARREL CACTUS HAVE BEEN RELOCATED TO THEIR FINAL LOCATION. GRADING HAS STARTED ALONG THE EXTERIOR AREAS OF THE GRADING LIMITS FOR THE INSTALLATION OF THE STORMWATER CONTROLS. THE CLEARING AND GRUBBING OF THE SITE WILL START IN THE NEXT 2 DAYS AND GRADING WILL FOLLOW AFTER THAT BY THE MIDDLE OF NEXT WEEK.
12/08/2010 GRADING - CHECK FOR ACTIVITY DROBERTS Approved WALKED THE SITE WITH JACK AND LOOKED AT ALL OF THE TRANSPLANTING OF THE BARREL CACTUS THAT HAS TAKEN PLACE ON THIS SITE. THEY HAVE RELOCATED OVER 520 CACTUS ON THIS SITE EVEN THOUGH 490 WERE ONLY CALLED OUT ON THE PLANS. THE GRADING LAYOUT WAS STAKED PRIOR TO PERFORMING THE PLANT RELOCATIONS.. THIS CREW IS PLACING SOME OF THE STORMWATER CONTROLS IN SOME OF THE AREAS NOTED ON THE STORMWATER PLANS, THE REMAINING MATERIAL WILL BE PLACED AS AREAS ARE CLEARED.
12/08/2010 ENGINEERING PRE-CONSTRUCTION DROBERTS Approved COMPLETED THE PRE-CON FOR THIS SITE.
12/22/2010 STORMWATER INSTALL OF CONTROLS DROBERTS Approved ALL MATERIAL HAS BEEN INSTALLED ON THIS SITE, GRADING OF THE SITE HAS BEGUN AND WILL CONTINUE FOR THE NEXT 2 MONTHS.
10/13/2011 GRADING - INTERMEDIATE DROBERTS Approved MET WITH JACK AND LOOKED OVER THE SITE TO SEE WHERE THEY ARE AT. I WILL PERFORM A FINAL GRADING INSPECTION ON MONDAY TO ENSURE THAT ALL OF THE ITEMS ARE COMPLETE PRIOR TO THE GRAND OPENNING ON WEDNESDAY.
10/17/2011 GRADING - REBAR DROBERTS Approved
10/17/2011 GRADING - TIER REV DROBERTS Approved
05/13/2020 LANDSCAPE INSPECTION DROBERTS Approved THIS SITE APPEARS TO HAVE BEEN COMPLETED PER THE APPROVED PLANS WITHOUT THE FINAL INSPECTION
05/13/2020 GRADING - FINAL DROBERTS Approved THIS SITE APPEARS TO HAVE BEEN COMPLETED PER THE APPROVED PLANS WITHOUT THE FINAL INSPECTION

Documents

File Name Document Type  
001_C1.1.TIF GRADING PLANS VIEW
002_C1.2.TIF GRADING PLANS VIEW
003_C1.3.TIF GRADING PLANS VIEW
004_C1.4.TIF GRADING PLANS VIEW
005_C1.5.TIF GRADING PLANS VIEW
006_C1.6.TIF GRADING PLANS VIEW
007_C1.7.TIF GRADING PLANS VIEW
008_C1.8.TIF GRADING PLANS VIEW
009_C1.9.TIF GRADING PLANS VIEW
None DOCUMENTS VIEW