Inspection Status: Approved
Inspection History: ENGINEERING PRE-CONSTRUCTION
| Date |
Description |
Inspector |
Results |
Comments |
| 12/08/2010 |
ENGINEERING PRE-CONSTRUCTION |
|
Approved |
COMPLETED THE PRE-CON FOR THIS SITE. |
| 11/24/2010 |
ENGINEERING PRE-CONSTRUCTION |
|
Continued |
MET WITH JACK OUT ON SITE AND DISCUSSED THE FUTURE PROJECT AND WHAT WOULD BE EXPECTED. HE HAS SCHEDULED THE PRE-CON FOR THIS SITE FOR 12/2/2010 AT WHICH TIME WE WILL TAKE A LOOK AT THE STORMWATER CONTROLS THAT HE IS PLANNING ON USING FOR THIS PROJECT. WE HAVE DISCUSSED THAT THEY WOULD LIKE TO MAKE SOME MODIFICATIONS. WE WILL WALK THROUGH THE SITE ON 11/30/2010 TO SEE WHAT WILL BE NEEDED ONCE HE HAS THE GRADING LIMITS STAKED. |