Permit: T09BU01841

Parcel: 13629003A


Addresses:

4325 S PANTANO RD


Inspection Status: Approved

Inspection History: STORMWATER FOLLOW-UP INSP

Permit Number - T09BU01841

Inspection Description - STORMWATER FOLLOW-UP INSP

Inspection Status - Approved

Date Description Inspector Results Comments
05/13/2020 STORMWATER FOLLOW-UP INSP Approved THIS SITE APPEARS TO HAVE BEEN COMPLETED PER THE APPROVED PLANS WITHOUT THE FINAL INSPECTION
10/17/2011 STORMWATER FOLLOW-UP INSP Continued NO CONCERNS AT THIS TIME, CREWS PREPARING FOR THE GRAND OPENNING ON 10/20/2011. STORMWATER CONTROLS WILL BE PULLED WHEN THE SITE IS FINALLY CLEARED.
06/06/2011 STORMWATER FOLLOW-UP INSP Continued NO CONCERNS AT THIS TIME.
02/07/2011 STORMWATER FOLLOW-UP INSP Continued NO CONCERNS AT THIS TIME.
01/24/2011 STORMWATER FOLLOW-UP INSP Continued NO CONCERNS AT THIS TIME, ALL ENTRANCES APPEAR TO BE WORKING, DUST BEING CONTROLLED BY THE WATER TRUCK ON-SITE, DEQ HAS VISITED THE SITE, NO CITATIONS HAVE BEEN ISSUED THAT I KNOW OF.
12/08/2010 STORMWATER FOLLOW-UP INSP Continued LOOKED AT THE SITE WITH JACK TODAY TO VERIFY THAT OVER 500 BARREL CACTUS HAVE BEEN RELOCATED TO THEIR FINAL LOCATION. GRADING HAS STARTED ALONG THE EXTERIOR AREAS OF THE GRADING LIMITS FOR THE INSTALLATION OF THE STORMWATER CONTROLS. THE CLEARING AND GRUBBING OF THE SITE WILL START IN THE NEXT 2 DAYS AND GRADING WILL FOLLOW AFTER THAT BY THE MIDDLE OF NEXT WEEK.