Permit: T09BU01688
Permit Details
Apply Date:
11/12/2009
Applicant:
WLB GROUP
Description:
GRADING:397CY CUT 161CY FILL
Contractors:
- IN N OUT BURGER INC
Permit Reviews
Permit Number - T09BU01688
Permit Status: Final
Permit Description: GRADING:397CY CUT 161CY FILL
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/05/2010 | RESUBMITTAL - GRADING | 01/14/2010 | COMPLETED |
| 11/12/2009 | PLANS OK TO SUBMIT - GRADING | 11/12/2009 | COMPLETED |
| 11/12/2009 | GRADING | 12/18/2009 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T09BU01688
Permit Status: Final
Permit Description: GRADING:397CY CUT 161CY FILL
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 11/12/2009 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: Final
Permit Number: T09BU01688
Permit Description: GRADING:397CY CUT 161CY FILL
Total Completed Inspections - 11
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/01/2010 | STORMWATER INSTALL OF CONTROLS | DROBERTS | Approved | |
| 05/25/2010 | LANDSCAPE INSPECTION | DROBERTS | Approved | |
| 05/25/2010 | STORMWATER FINAL INSPECTION | DROBERTS | Approved | |
| 05/25/2010 | STORMWATER FOLLOW-UP INSP | DROBERTS | Approved | |
| 05/25/2010 | GRADING - FINAL | DROBERTS | Approved | ALL WORK IS COMPLETE |
| 05/25/2010 | GRADING - INTERMEDIATE | DROBERTS | Approved | |
| 05/25/2010 | GRADING - CHECK FOR ACTIVITY | DROBERTS | Approved | INTERNAL WORK FOR THE FLOOR SLABS IS ALL THAT IS PENDING AT THIS TIME. |
| 05/25/2010 | GRADING - REBAR | DROBERTS | Approved | |
| 05/25/2010 | GRADING - TIER REV | DROBERTS | Approved | NO CHANGES NOTED |
| 12/14/2010 | ENGINEERING PRE-CONSTRUCTION | DROBERTS | Approved | MET ON-SITE WITH JOSE AND DISCUSSED WHAT WAS DONE DURING YESTERDAYS PRE-CON MEETING. FOOTING EXCAVATION OF THE SITE WILL START DURING THE FIRST PART OF NEXT WEEK, CONTROLS WILL BE CHECKED TO ENSURE THAT NO OFF-SITE CONTAMINATION IS BEING DONE. |
| 05/13/2020 | ELECTRIC - TEMP POWER FOR TEST | DROBERTS | Approved | SITE APPEARS TO HAVE BEEN COMPLETED PER THE APPROVED PLANS |