Inspection Status: Approved
Inspection History: GRADING - CHECK FOR ACTIVITY
| Date |
Description |
Inspector |
Results |
Comments |
| 05/25/2010 |
GRADING - CHECK FOR ACTIVITY |
|
Approved |
INTERNAL WORK FOR THE FLOOR SLABS IS ALL THAT IS PENDING AT THIS TIME. |
| 02/22/2010 |
GRADING - CHECK FOR ACTIVITY |
|
Continued |
DEMO WORK WAS SIGNED OFF ON 2/22/2010, THE BUILDING WORK IS UNDERWAY AT THIS TIME. NO CONCERNS AT THIS TIME. |
| 01/26/2010 |
GRADING - CHECK FOR ACTIVITY |
|
Continued |
MET ON-SITE WITH JOSE THIS MORNING TO LOOK OVER THE WORK THAT IS TAKING PLACE AND THE WORK THAT WILL BE DONE IN THE NEAR FUTURE. CURRENTLY THE CONTRACTOR IS CONTROLLING ALL OF THE MOVEMENT OF SOILS AT THIS TIME. JOSE SAYS THAT HE WILL BE WORKING ON INSTALLING WADDLE AS NEEDED IN THE NEXT FEW WEEKS WHEN THEY START TO WORK ON THIS SITE. I GAVE HIM THE PRECON FORM FOR THIS SITE AND ASKED THAT HE PROVIDE ALL OF THE CONTACT INFORMATION FOR ALL OF THE SUBS THAT WILL BE INVOLVED WITH THIS SITE. HE WILL CONTACT ME ONCE HE HAS THE PAPERWORK FINISHED AND WE WILL MEET TO TALK ABOUT ANY OTHER ITEMS THAT MIGHT ARISE IN THE NEAR FUTURE. |
| 01/21/2010 |
GRADING - CHECK FOR ACTIVITY |
|
Continued |
CHECKED THIS SITE TO SEE IF ANY OF THE WORK HAD STARTED. MINOR REMOVAL OF THE AREA IS STARTING, I REMINDED THE CREW TO HAVE THE PRE-CON FOR THE SITE CALLED IN THE FIRST OF NEXT WEEK. LEFT A MESAGE FOR JOSE VASQUEZ AT 626-905-1023 TO MEET ON-SITE ON 1/26/2010 BETWEEN 7:00 AND 7:30, DEMOLITION OF THE SITE HAS ALREADY STARTED. |