Permit: T09BU01523
Permit Details
Apply Date:
10/09/2009
Applicant:
JAMES MCMAHON
Description:
GRADING FOR NEW OFFICE/WAREHOUSE
Contractors:
- C A DEVELOPMENT AND CONSTRUCTION L L C
Permit Reviews
Permit Number - T09BU01523
Permit Status: Expired
Permit Description: GRADING FOR NEW OFFICE/WAREHOUSE
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/11/2010 | GRADING | 05/03/2010 | COMPLETED |
| 05/03/2010 | RESUBMITTAL - GRADING ALL | 01/05/2012 | COMPLETED |
| 10/09/2009 | GRADING | 10/29/2009 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T09BU01523
Permit Status: Expired
Permit Description: GRADING FOR NEW OFFICE/WAREHOUSE
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 10/09/2009 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Outstanding Inspections
Permit Status: Expired
Permit Number: T09BU01523
Permite Description: GRADING FOR NEW OFFICE/WAREHOUSE
Total Outstanding Inspections - 4
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| GRADING - TIER REV | N/A | Not Inspected | ||
| 07/19/2012 | LANDSCAPE INSPECTION | N/A | Not ready for Inspection | NO WORK BEING PERFORMED AT THIS TIME FOR THIS ITEM. |
| 12/11/2012 | STORMWATER FOLLOW-UP INSP | N/A | Continued | BLDG NEARING COMPLETION, HOWEVER MOST SITE WORK STILL NEEDED. NO STORM WATER CONCERNS AT THIS TIME |
| 12/11/2012 | GRADING - INTERMEDIATE | N/A | Continued | BLDG NEARING COMPLETION, HOWEVER MOST SITE WORK STILL NEEDED. NO STORM WATER CONCERNS AT THIS TIME |
Completed Inspections
Permit Status: Expired
Permit Number: T09BU01523
Permit Description: GRADING FOR NEW OFFICE/WAREHOUSE
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/09/2012 | ENGINEERING PRE-CONSTRUCTION | MRUSSO | Approved | 1) SITE IS LESS THAN 1 ACRE, THERFORE A SWPPP IS NOT REQUIRED. 2) PROTECT THE EXISTING CATCH BASIN LOCATED ALONG THE SW CORNER OF THE SITE FROM SOIL GENERATED FROM CONSTRUCTION ACTIVITIES. 3) SWEEP UP ANY TRACKED SOIL OFF ADJACENT PUBLIC ROADWAYS ROUTINELY. 4) CALL FOR INSPECTION FOR ANY CHANGES MADE TO THE APPROVED GRADING PLAN. 5) ENSURE ANY WASTE MATERIALS GENERATED ON SITE MUST STAY ON SITE AND BE DISPOSED OF PROPERLY. 6) CALL FOR RE-ISPECTION AS NEEDED (CARLOS 631-4045/FERNANDO 861-9277/ DAN 907-8793) |
| 08/20/2012 | GRADING - REBAR | DROBERTS | Approved | |
| 12/11/2012 | SWPPP CORRECTION NOTICE | MRUSSO | Approved |