Inspection History Details
Inspection Status: Continued
Inspection History: GRADING - INTERMEDIATE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/14/2013 | GRADING - INTERMEDIATE | Continued | SITE MOSTLY COMPLETE, NO SIGNIFICANT CHANGES TO THE APPROVED PLANS. | |
| 01/04/2013 | GRADING - INTERMEDIATE | Continued | NO CHANGES AND/OR CONCERNS AT THIS TIME | |
| 12/11/2012 | GRADING - INTERMEDIATE | Continued | BLDG NEARING COMPLETION, HOWEVER MOST SITE WORK STILL NEEDED. NO STORM WATER CONCERNS AT THIS TIME |
|
| 08/20/2012 | GRADING - INTERMEDIATE | Continued | CHECKED THE SITE TOO SEE WHAT WORK HAS BEEN ACCOMPLISHED SINCE MY LAST SITE VISIT. CREWS CONTINUE TO WORK ON THE BUILDING CONSTRUCTION AND HAVE STARTED WORK OUTSIDE THE BUILDING ON THE NORTHSIDE OF THE SITE. CREWS ARE WORKING ON THE GRADING FOR THE TRASH ENCLOSURE AND FORMING OF SOME OF THE SIDEWALK | |
| 07/19/2012 | GRADING - INTERMEDIATE | Continued | CREWS CONTINUE TO WORK ON THE BUILDING AT THIS TIME. ASK THE CREW TO MAKE SURE THAT THEY CONTINUE TO PICK UP THE SITE, AND MAKE SOME MINOR ADJUSTMENTS IN THE SWPPP CONTROLS. | |
| 07/03/2012 | GRADING - INTERMEDIATE | Continued | NO SITE WORK AT THIS TIME | |
| 06/28/2012 | GRADING - INTERMEDIATE | Continued | CONTRACTOR WORKING ON BLDG ONLY, NO SITE WORK AT THIS TIME. NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME |
|
| 06/22/2012 | GRADING - INTERMEDIATE | Continued | NO CONCERS AND OR PROBLEMS AT THIS TIME. CONTRACTOR WORKING ON BLDG ONLY, NO SITE WORK AT THIS TIME | |
| 06/21/2012 | GRADING - INTERMEDIATE | Continued | NO SITE WORK BEING DONE AT THIS TIME. NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME |
|
| 06/07/2012 | GRADING - INTERMEDIATE | Continued | 1) STOCKPILED SOIL HAS BEEN MOVED AWAY FROM THE PERIMETER OF THE SITE. 2) CONTINUE TO SWEEP UP ANY TRACKED SOIL OFF OF ADJACENT ROADWAY. 3) CALL FOR INSPECTION FOR ANY CHANGES TO THE ORIGINAL GRADING PLAN AND/OR ANY CONCERNS WITH SITE WORK. |
|
| 05/16/2012 | GRADING - INTERMEDIATE | Correction Required | CORRECTION REQUIRED: REMOVE STOCKPILED SOIL FROM SE CORNER OF SITE AND OR BRING SOIL BACK ONTO SITE AND PLACE SEDIMENT CONTROLS AROUND IT. CORRECT BY 7 WORKING DAYS NON-COMPLIANCE WILL RESULT IN A NOTICE OF VIOLATION. |
|
| 05/14/2012 | GRADING - INTERMEDIATE | Continued | NO CHANGES AND/OR STORM WATER CONCERNS AT THIS TIME | |
| 05/01/2012 | GRADING - INTERMEDIATE | Continued | NO SIGNIFICANT CONCERNS AT THIS TIME | |
| 04/18/2012 | GRADING - INTERMEDIATE | Continued | CONTRACTOR CALLED IN FOR AN INSPECTION ON THE RE-BAR LAY OUT FOR THE FOOTING OF THE FOUNDATION. HAD CONTRACTOR CALL BLDG INSPECTOR. NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME. |
|
| 04/04/2012 | GRADING - INTERMEDIATE | Continued | 1) SWEEP UP TRACKING OFF OF PUBLIC ROADWAY AND RIGHT - OF WAY. 2) ADD SEDIMENT CONTROLS ALONG WEST SIDE NEAR EXISTING CATCH BASIN. |