Inspection History Details
Inspection Status: Approved
Inspection History: SWPPP CORRECTION NOTICE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/11/2012 | SWPPP CORRECTION NOTICE | Approved | ||
| 06/28/2012 | SWPPP CORRECTION NOTICE | Continued | CONTRACTOR WORKING ON BLDG ONLY, NO SITE WORK AT THIS TIME. NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME |
|
| 06/22/2012 | SWPPP CORRECTION NOTICE | Continued | NO CONCERS AND OR PROBLEMS AT THIS TIME. CONTRACTOR WORKING ON BLDG ONLY, NO SITE WORK AT THIS TIME | |
| 06/21/2012 | SWPPP CORRECTION NOTICE | Continued | NO SITE WORK BEING DONE AT THIS TIME. NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME |
|
| 06/07/2012 | SWPPP CORRECTION NOTICE | Continued | 1) STOCKPILED SOIL HAS BEEN MOVED AWAY FROM THE PERIMETER OF THE SITE. 2) CONTINUE TO SWEEP UP ANY TRACKED SOIL OFF OF ADJACENT ROADWAY. 3) CALL FOR INSPECTION FOR ANY CHANGES TO THE ORIGINAL GRADING PLAN AND/OR ANY CONCERNS WITH SITE WORK. |
|
| 05/25/2012 | SWPPP CORRECTION NOTICE | Continued | STOCK PILE HAS BEEN MOVE BACK. STILL NEEDS TO ADD CONTROLS. | |
| 05/16/2012 | SWPPP CORRECTION NOTICE | Correction Required | CORRECTION REQUIRED: REMOVE STOCKPILED SOIL FROM SE CORNER OF SITE AND OR BRING SOIL BACK ONTO SITE AND PLACE SEDIMENT CONTROLS AROUND IT. CORRECT BY 7 WORKING DAYS NON-COMPLIANCE WILL RESULT IN A NOTICE OF VIOLATION. |