Permit: T09BU01173
Permit Details
Apply Date:
08/10/2009
Applicant:
N/A
Description:
GRADING AND PAVING TO SOUTHEAST PARKING (EXPANSION)
Contractors:
- TUCSON ASPHALT CONTRACTOR*C
Permit Reviews
Permit Number - T09BU01173
Permit Status: Final
Permit Description: GRADING AND PAVING TO SOUTHEAST PARKING (EXPANSION)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/07/2014 | REVISION - GRADING | 02/25/2014 | COMPLETED |
| 03/09/2010 | RESUBMITTAL - GRADING | 03/09/2010 | COMPLETED |
| 03/09/2010 | RESUBMITTAL - GRADING | 03/16/2010 | COMPLETED |
| 03/16/2010 | RESUBMITTAL - GRADING | 03/26/2010 | COMPLETED |
| 03/26/2010 | REVISION - GRADING | 04/23/2010 | COMPLETED |
| 04/23/2010 | RESUBMITTAL - GRADING | 06/22/2010 | COMPLETED |
| 06/13/2014 | REVISION - GRADING | 06/16/2014 | COMPLETED |
| 06/18/2010 | REVISION - GRADING | 06/22/2010 | COMPLETED |
| 08/10/2009 | GRADING | 08/10/2009 | COMPLETED |
| 08/10/2009 | RESUBMITTAL - GRADING ALL | 08/28/2009 | COMPLETED |
| 08/26/2010 | REVISION - GRADING | 05/09/2011 | COMPLETED |
| 08/28/2009 | RESUBMITTAL - GRADING ALL | 08/28/2009 | COMPLETED |
| 10/09/2009 | GRADING | 10/09/2009 | COMPLETED |
| 12/08/2009 | GRADING | 12/08/2009 | COMPLETED |
| 12/08/2009 | GRADING | 03/09/2010 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T09BU01173
Permit Status: Final
Permit Description: GRADING AND PAVING TO SOUTHEAST PARKING (EXPANSION)
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 08/10/2009 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: Final
Permit Number: T09BU01173
Permit Description: GRADING AND PAVING TO SOUTHEAST PARKING (EXPANSION)
Total Completed Inspections - 7
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/28/2009 | GRADING - FINAL | DROBERTS | Approved | WALKED THE SITE WITH THE PLANS TO SEE WHAT WAS MISSING ON THIS SITE AND DETERMINE HOW MUCH TIME I WILL NEED TO INSPECT IT FOR A FULL RELEASE OF THE GRADING PERMIT. HAVE BEEN ADVISED BY THE CONTRACTOR (TUCSON ASPHALT) THAT THEY ARE ONLY RESPONSIBLE FOR THE ASPHALTS AT THE NORTHWEST CORNER OF THE SITE AND ALONG THE SOUTHERN SIDE OF THIS SITE. I HAVE BEEN TALKING TO JOE W/TUCSON ASPHALT AT 302-5722 ABOUT THIS SITE. HAVE ADVISED THAT THERE ARE ISSUES WITH THIS SITE THAT IS OUTSIDE OF HIS SCOPE OF WORK SO I WILL BE CONSULTING THE ENGINEERING REVIEW STAFF ABOUT THIS MATTER PRIOR TO POSTING ANY COMMENTS INTO PERMITS PLUS. I WILL RETURN BACK TO THIS SITE ON 12/29/2009 AND TAKE PICTURES OF ALL OF THE SITE CONDITIONS AS THEY STAND AT THIS TIME. |
| 12/29/2009 | GRADING - INTERMEDIATE | DROBERTS | Approved | WALKED THE SITE WITH THE PLANS TO VERIFY THAT CERTAIN ASPECTS HAVE BEEN COMPLETED PRIOR TO THE RELEASE OF THE FINAL C OF O. I HAVE FOUND PLENTY OF ITEMS THAT HAVE NOT BEEN COMPLETED AT THIS TIME PER THE APPROVED PLANS(AS-BUILT DRAWINGS). I CONTACTED BIANCA RAMIEREZ AND ADVISED HER THAT I WOULD NEED TO SET DOWN WITH HER AND ELIZABETH LIEBOLD TO DISCUSS THE INSUFFICIENTCIES PRIOR TO PLACING THE RESULTS INTO PERMITS PLUS. A MEETING HAS BEEN SET TO BE HELD ON THE 5TH OR 6TH OF JANUARY TO REVIEW THE PLANS AND THE PHOTO'S PRIOR TO PLACING THE FINAL COMMENTS FOR THE INSPECTION. |
| 09/07/2010 | ENGINEERING PRE-CONSTRUCTION | DROBERTS | Approved | |
| 09/07/2010 | GRADING - TIER REV | DROBERTS | Approved | WALKED THE SITE WITH THE ENGINEERING REVIEWER TO VERIFY THAT THE DSMR PLAN CONTAINED ALL OF THE CORRECT INFORMATION AND THAT IT HAD BEEN COMPLETED PER THE APPROVED PLANS. |
| 09/08/2010 | GRADING - CHECK FOR ACTIVITY | DROBERTS | Approved | |
| 09/08/2010 | GRADING - REBAR | DROBERTS | Approved | |
| 09/28/2010 | LANDSCAPE INSPECTION | DROBERTS | Approved | PREVIOUSLY APPROVED BY ANDREWW CONNOR ON 6/18/2010 ON PERMIT #T09CM00065. |