Permit Details

Status:
Final
Type:
Grading and SWPPP
Address:
1770 W COPPER ST
Address NEW:
1770 W COPPER ST
Apply Date:
07/14/2009
Applicant:
JOHN R HUCKO
Description:
GRADING:BALL FIELDS AT JUHAN PARK
Contractors:
  • ANDERSON CONSTRUCTION CORP , M

Permit Reviews

Permit Number - T09BU01035
Permit Status: Final
Permit Description: GRADING:BALL FIELDS AT JUHAN PARK
Start Date Submittal Complete Date Status  
07/14/2009 PLANS OK TO SUBMIT - GRADING 07/14/2009 COMPLETED Review Details
07/15/2009 GRADING 10/01/2009 COMPLETED Review Details
10/01/2009 RESUBMITTAL - GRADING ALL 10/26/2009 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T09BU01035
Permit Status: Final
Permit Description: GRADING:BALL FIELDS AT JUHAN PARK
Total Outstanding Activity Conditions - 1
Date Name
07/14/2009 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.

Completed Inspections

Permit Status: Final
Permit Number: T09BU01035
Permit Description: GRADING:BALL FIELDS AT JUHAN PARK
Total Completed Inspections - 11
Date Description Inspector Results Comments
11/04/2009 GRADING - CHECK FOR ACTIVITY MRUSSO Approved NO ACTIVITY ON SITE
12/22/2009 NPPO PRE PERMIT INSPECTION ACONNOR Approved
12/23/2009 STORMWATER INSTALL OF CONTROLS MRUSSO Approved MET W/ SUPINTENDENT AND DISCUSSED PROJECT AND SWPPP REQUIREMENTS.
SEDIMENT CONTROLS HAVE BEEN INSTALLED PER STORM WATER PLAN.
CONTROLS MUST BE MAINTAINED THROUGHOUT THE DURATION OF THE CONSTRUCTION UNTIL THE SITE IS STABILIZED.
PERFORM SELF INSPECTIONS PER PLAN AND DOCUMENT THEM.
12/23/2009 ENGINEERING PRE-CONSTRUCTION MRUSSO Approved MET W/ SUPINTENDENT AND DISCUSSED PROJECT AND SWPPP REQUIREMENTS.
SEDIMENT CONTROLS HAVE BEEN INSTALLED PER STORM WATER PLAN.
CONTROLS MUST BE MAINTAINED THROUGHOUT THE DURATION OF THE CONSTRUCTION UNTIL THE SITE IS STABILIZED.
PERFORM SELF INSPECTIONS PER PLAN AND DOCUMENT THEM.
12/31/2009 STORMWATER FOLLOW-UP INSP MRUSSO Approved CONTRACTOR WORKING ON SUBGRADE OF BALL FIELD.
NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME
12/31/2009 GRADING - INTERMEDIATE MRUSSO Approved CONTRACTOR WORKING ON SUBGRADE OF BALL FIELD.
NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME
06/29/2010 GRADING - FINAL MRUSSO Approved
06/29/2010 STORMWATER FINAL INSPECTION MRUSSO Approved
07/16/2010 LANDSCAPE INSPECTION MRUSSO Approved
07/21/2010 PERMIT FINALED KMEDINA Approved
06/07/2019 GRADING - REBAR RLEDONNE Approved

Documents

File Name Document Type  
None DOCUMENTS VIEW
001_C-1.TIF GRADING PLANS VIEW
002_C-2.TIF GRADING PLANS VIEW
003_C-3.TIF GRADING PLANS VIEW
004_C-3A.TIF GRADING PLANS VIEW
005_C-4.TIF GRADING PLANS VIEW