Inspection History Details
Inspection Status: Approved
Inspection History: STORMWATER INSTALL OF CONTROLS
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/23/2009 | STORMWATER INSTALL OF CONTROLS | Approved | MET W/ SUPINTENDENT AND DISCUSSED PROJECT AND SWPPP REQUIREMENTS. SEDIMENT CONTROLS HAVE BEEN INSTALLED PER STORM WATER PLAN. CONTROLS MUST BE MAINTAINED THROUGHOUT THE DURATION OF THE CONSTRUCTION UNTIL THE SITE IS STABILIZED. PERFORM SELF INSPECTIONS PER PLAN AND DOCUMENT THEM. |