Permit: T09BU01026
Permit Details
Apply Date:
07/14/2009
Applicant:
TIM BIRK:COVENIER ENGINEERING
Description:
GRADING:600CY CUT 2500CY FILL
Contractors:
- CAYLOR CONSTRUCTION COMPANY , RO
Permit Reviews
Permit Number - T09BU01026
Permit Status: Final
Permit Description: GRADING:600CY CUT 2500CY FILL
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
07/01/2010 | REVISION - GRADING | 07/07/2010 | COMPLETED |
07/14/2009 | PLANS OK TO SUBMIT - GRADING | 07/14/2009 | COMPLETED |
07/14/2009 | GRADING | 08/04/2009 | COMPLETED |
07/14/2009 | SWPPP | 07/30/2009 | COMPLETED |
08/18/2009 | RESUBMITTAL - GRADING ALL | 09/09/2009 | COMPLETED |
08/18/2009 | RESUBMITTAL - SWPPP | 08/20/2009 | COMPLETED |
09/09/2009 | RESUBMITTAL - GRADING | 05/24/2010 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T09BU01026
Permit Status: Final
Permit Description: GRADING:600CY CUT 2500CY FILL
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
07/14/2009 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: Final
Permit Number: T09BU01026
Permit Description: GRADING:600CY CUT 2500CY FILL
Total Completed Inspections - 11
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/03/2009 | GRADING - CHECK FOR ACTIVITY | MRUSSO | Approved | NO ACTIVITY ON SITE/CONSTR NOT STARTED |
06/03/2010 | ENGINEERING PRE-CONSTRUCTION | MRUSSO | Approved | CONTRACTOR INSTALLED TEMP SEDIMENT CONTROLS ALONG THE NORTH PERIMETER OF THE SITE PER PRECON MEETING. CONTRACTOR NEEDS TO DO A BETTER JOB OF SWEEPING UP THE TRACKING OF SOIL OFF OF THE ENTRANCE ROAD IN ORDER TO PREVENT TRACKING ONTO THE PUBLIC ROADWAY. CONTRACTOR WORKING ON OVER-EXCAVATING THE FOUNDATION PAD FOR THE NEW BLDG. NO OTHER CONCERNS REGARDING THE STORM WATER PERMIT AT THIS TIME. |
06/03/2010 | STORMWATER FOLLOW-UP INSP | MRUSSO | Approved | CONTRACTOR INSTALLED TEMP SEDIMENT CONTROLS ALONG THE NORTH PERIMETER OF THE SITE PER PRECON MEETING. CONTRACTOR NEEDS TO DO A BETTER JOB OF SWEEPING UP THE TRACKING OF SOIL OFF OF THE ENTRANCE ROAD IN ORDER TO PREVENT TRACKING ONTO THE PUBLIC ROADWAY. CONTRACTOR WORKING ON OVER-EXCAVATING THE FOUNDATION PAD FOR THE NEW BLDG. NO OTHER CONCERNS REGARDING THE STORM WATER PERMIT AT THIS TIME. |
06/03/2010 | STORMWATER INSTALL OF CONTROLS | MRUSSO | Approved | CONTRACTOR INSTALLED TEMP SEDIMENT CONTROLS ALONG THE NORTH PERIMETER OF THE SITE PER PRECON MEETING. CONTRACTOR NEEDS TO DO A BETTER JOB OF SWEEPING UP THE TRACKING OF SOIL OFF OF THE ENTRANCE ROAD IN ORDER TO PREVENT TRACKING ONTO THE PUBLIC ROADWAY. CONTRACTOR WORKING ON OVER-EXCAVATING THE FOUNDATION PAD FOR THE NEW BLDG. NO OTHER CONCERNS REGARDING THE STORM WATER PERMIT AT THIS TIME. |
08/27/2010 | GRADING - INTERMEDIATE | MRUSSO | Approved | |
08/27/2010 | LANDSCAPE INSPECTION | MRUSSO | Approved | |
08/31/2010 | GRADING - REBAR | DROBERTS | Approved | NOT REQUIRED. |
08/31/2010 | GRADING - FINAL | DROBERTS | Approved | WORK HAS BEEN COMPLETED FOR THIS SITE IN REGARDS TO THE UTILITIES, AND THE CONSTRUCTION OF THE FUTURE BUILDING PAD. THERE WILL BE NO WORK PERFORMED ON THIS SITE FOR THE FUTURE BUILDING, THIS WILL BE DONE UNDER ANOTHER PERMIT. |
08/31/2010 | STORMWATER FINAL INSPECTION | DROBERTS | Approved | |
08/31/2010 | GRADING - FINAL | DROBERTS | Approved | |
08/31/2010 | NPPO PRE PERMIT INSPECTION | DROBERTS | Approved |