Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING PRE-CONSTRUCTION
Permit Number - T09BU01026
Inspection Description - ENGINEERING PRE-CONSTRUCTION
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/03/2010 | ENGINEERING PRE-CONSTRUCTION | Approved | CONTRACTOR INSTALLED TEMP SEDIMENT CONTROLS ALONG THE NORTH PERIMETER OF THE SITE PER PRECON MEETING. CONTRACTOR NEEDS TO DO A BETTER JOB OF SWEEPING UP THE TRACKING OF SOIL OFF OF THE ENTRANCE ROAD IN ORDER TO PREVENT TRACKING ONTO THE PUBLIC ROADWAY. CONTRACTOR WORKING ON OVER-EXCAVATING THE FOUNDATION PAD FOR THE NEW BLDG. NO OTHER CONCERNS REGARDING THE STORM WATER PERMIT AT THIS TIME. |
|
05/27/2010 | ENGINEERING PRE-CONSTRUCTION | Continued | PRE-CON MEETING PERFORMED W/ GENERAL AND SUBCONTRACTOR. CONTRACTOR STATED THAT HE WILL BE CONSTRUCTING THE FIRST PHASE OF THE PROJECT ONLY - UTILITIES AND THE PAD FOR THE BLDG, THE BLDG MAY NOT BE CONSTRUCTED FOR A YEAR OR MORE. PLACE TEMP SEDIMENT CONTROLS (SILT SOCK) AT NORTH PERIMETER FENCE IN THE FLOW LINE OF THE EXISTING ASPHALT ROADWAY (DRAINAGE). ADDITIONAL CONTROLS MAY NEED TO BE ADDED AT A LATER TIME, DEPENDING ON CONSTRUCTION. ENSURE TRACKING IS SWEPT OFF OF PUBLIC ROADWAYS AS NECESSARY. CALL FOR RE-INSPECTION FOR ANY CONCERNS. |