Inspection History Details
Inspection Status: Approved
Inspection History: STORMWATER FOLLOW-UP INSP
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/03/2010 | STORMWATER FOLLOW-UP INSP | Approved | CONTRACTOR INSTALLED TEMP SEDIMENT CONTROLS ALONG THE NORTH PERIMETER OF THE SITE PER PRECON MEETING. CONTRACTOR NEEDS TO DO A BETTER JOB OF SWEEPING UP THE TRACKING OF SOIL OFF OF THE ENTRANCE ROAD IN ORDER TO PREVENT TRACKING ONTO THE PUBLIC ROADWAY. CONTRACTOR WORKING ON OVER-EXCAVATING THE FOUNDATION PAD FOR THE NEW BLDG. NO OTHER CONCERNS REGARDING THE STORM WATER PERMIT AT THIS TIME. |