Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: T09BU00796
Permit Details
Apply Date:
06/02/2009
Applicant:
KEITH RABENNECK
Description:
GRADING FOR NEW SUBDIVISION
Contractors:
- STRUNK EXCAVATING INC , R W
Permit Reviews
Permit Number - T09BU00796
Permit Status: Final
Permit Description: GRADING FOR NEW SUBDIVISION
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
06/02/2009 | GRADING | 06/02/2009 | COMPLETED |
06/02/2009 | GRADING | 07/27/2009 | COMPLETED |
07/27/2009 | RESUBMITTAL - GRADING ALL | 08/25/2009 | COMPLETED |
08/25/2009 | GRADING | 08/25/2009 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T09BU00796
Permit Status: Final
Permit Description: GRADING FOR NEW SUBDIVISION
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
06/02/2009 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: Final
Permit Number: T09BU00796
Permit Description: GRADING FOR NEW SUBDIVISION
Total Completed Inspections - 13
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/03/2009 | NPPO PRE PERMIT INSPECTION | ACONNOR | Approved | |
08/03/2009 | ENGINEERING PRE-CONSTRUCTION | MRUSSO | Approved | 1) INSTALL WADDLE (SILT SOCK) ALONG EAST PERIMETER FROM ROADWAY TO THE SOUTH 240'. 2) INSTALL A STABILIZED CONSTRUCTION ENTRANCE PER YOUR SWPPP. 3) SWEEP UP TRACKING OF SOIL OFF PUBLIC ROADWAY ROUTINELY. 4) MAINTAIN AND INSPECT SEDIMENT CONTROLS PER PLAN AND DOCUMENT THE INSPECTIONS. 5) INSTALL A CONCRETE/MATERIALS WASH OUT ON SITE WHEN APPLICABLE. CALL FOR REINSPECTION/APPROVAL OF INSTALL. |
08/06/2009 | STORMWATER INSTALL OF CONTROLS | MRUSSO | Approved | SEDIMENT CONTROLS HAVE BEEN INSTALLED PER PRECON MEETING AGREEMENT AND THE SWPPP. 1) ENSURE A CONCRETE/MATERIALS WASH OUT IS INSTALLED WHEN APPLICABLE. 2) CONTINUE TO SWEEP UP TRACKING OFF OF PUBLIC ROADWAY. 3) MAINTAIN STORM WATER CONTROLS THROUGHOUT THE DURATION OF CONSTRUCTION. ALL FURTHER STORM WATER INSPECTION WILL BE ADDRESSED UNDER #09154 STORM WATER FOLLOW UP INSPECTIONS. |
12/04/2009 | STORMWATER FOLLOW-UP INSP | MRUSSO | Approved | NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME ENG OF RECORD PROVIDED A STATEMENT CHANGING THE VERTICAL CURB AND FOOTER SHOWN ON APPROVED PLAN ALONG WEST PERIMETER OF SITE TO THE STANDARD VERTICAL CURB DUE TO THE FACT THAT THE DIFFERENCE IN ELEVATION BETWEEN THE ROAD AND NATURAL GROUND IS NOT AS GREAT AS FIRST THOUGHT. SEE COPY OF STATEMENT IN FILE |
12/04/2009 | GRADING - INTERMEDIATE | MRUSSO | Approved | ENG OF RECORD PROVIDED A STATEMENT CHANGING THE VERTICAL CURB AND FOOTER SHOWN ON APPROVED PLAN ALONG WEST PERIMETER OF SITE TO THE STANDARD VERTICAL CURB DUE TO THE FACT THAT THE DIFFERENCE IN ELEVATION BETWEEN THE ROAD AND NATURAL GROUND IS NOT AS GREAT AS FIRST THOUGHT. SEE COPY OF STATEMENT IN FILE |
12/04/2009 | GRADING - TIER REV | MRUSSO | Approved | ENG OF RECORD PROVIDED A STATEMENT CHANGING THE VERTICAL CURB AND FOOTER SHOWN ON APPROVED PLAN ALONG WEST PERIMETER OF SITE TO THE STANDARD VERTICAL CURB DUE TO THE FACT THAT THE DIFFERENCE IN ELEVATION BETWEEN THE ROAD AND NATURAL GROUND IS NOT AS GREAT AS FIRST THOUGHT. SEE COPY OF STATEMENT IN FILE. |
01/08/2010 | GRADING - FINAL | MRUSSO | Approved | SITE HAS BEEN CONSTRUCTED PER THE APPROVED GRADING PLAN. |
01/08/2010 | STORMWATER FINAL INSPECTION | MRUSSO | Approved | SITE HAS BEEN STABILIZED |
01/08/2010 | GRADING - FINAL | MRUSSO | Approved | |
01/08/2010 | GRADING - CHECK FOR ACTIVITY | MRUSSO | Approved | |
01/14/2010 | LANDSCAPE INSPECTION | ACONNOR | Approved | |
01/19/2010 | PERMIT FINALED | KMEDINA | Approved | |
06/17/2019 | GRADING - REBAR | RLEDONNE | Approved |