Permit: T09BU00796

Parcel: 99999999A

Inspection Status: Approved

Inspection History: ENGINEERING PRE-CONSTRUCTION

Date Description Inspector Results Comments
08/03/2009 ENGINEERING PRE-CONSTRUCTION Approved 1) INSTALL WADDLE (SILT SOCK) ALONG EAST PERIMETER FROM ROADWAY TO THE SOUTH 240'.
2) INSTALL A STABILIZED CONSTRUCTION ENTRANCE PER YOUR SWPPP.
3) SWEEP UP TRACKING OF SOIL OFF PUBLIC ROADWAY ROUTINELY.
4) MAINTAIN AND INSPECT SEDIMENT CONTROLS PER PLAN AND DOCUMENT THE INSPECTIONS.
5) INSTALL A CONCRETE/MATERIALS WASH OUT ON SITE WHEN APPLICABLE.

CALL FOR REINSPECTION/APPROVAL OF INSTALL.