Inspection History Details
Inspection Status: Approved
Inspection History: STORMWATER INSTALL OF CONTROLS
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/06/2009 | STORMWATER INSTALL OF CONTROLS | Approved | SEDIMENT CONTROLS HAVE BEEN INSTALLED PER PRECON MEETING AGREEMENT AND THE SWPPP. 1) ENSURE A CONCRETE/MATERIALS WASH OUT IS INSTALLED WHEN APPLICABLE. 2) CONTINUE TO SWEEP UP TRACKING OFF OF PUBLIC ROADWAY. 3) MAINTAIN STORM WATER CONTROLS THROUGHOUT THE DURATION OF CONSTRUCTION. ALL FURTHER STORM WATER INSPECTION WILL BE ADDRESSED UNDER #09154 STORM WATER FOLLOW UP INSPECTIONS. |