Permit: T09BU00777
Permit Details
Apply Date:
05/28/2009
Applicant:
ERIN LOUDERMILK
Description:
GRADING
Contractors:
- M C O AND ASSOCIATES L L C
Permit Reviews
Permit Number - T09BU00777
Permit Status: Final
Permit Description: GRADING
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
02/10/2010 | RESUBMITTAL - GRADING | 04/23/2010 | COMPLETED |
05/17/2010 | REVISION - GRADING | 05/17/2010 | COMPLETED |
05/28/2009 | PLANS OK TO SUBMIT - GRADING | 05/28/2009 | COMPLETED |
05/28/2009 | GRADING | 07/02/2009 | COMPLETED |
07/02/2009 | RESUBMITTAL - GRADING ALL | 07/22/2009 | COMPLETED |
07/22/2009 | RESUBMITTAL - GRADING ALL | 02/10/2010 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T09BU00777
Permit Status: Final
Permit Description: GRADING
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
05/28/2009 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: Final
Permit Number: T09BU00777
Permit Description: GRADING
Total Completed Inspections - 9
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/20/2010 | STORMWATER INSTALL OF CONTROLS | MRUSSO | Approved | REVISED PLAN ISSUED SHOWING ELVATION CHANGES TO FINISH FLOOR AND SITE DRAINAGE. 1) TEMP SEDIMENT CONTROLS ARE IN PLACE AND SHOULD BE MAINTAINED THROUGHOUT THE DURATION OF CONSTRUCTION 2) ENSURE STORM WATER SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED. 3) PROVIDE A CESIGNATED CONCRETE/MATERIALS WASH OUT WHEN APPLICABLE. 4) ENSURE TRACKING OF SOIL ONTO PUBLIC ROADWAYS IS SWEPT ROUTINELY. ANY CONCERNS OR CHANGES ASSOCIATED W/ YOUR GRADING PERMIT CALL FOR RE-INSPECTION |
05/20/2010 | ENGINEERING PRE-CONSTRUCTION | MRUSSO | Approved | REVISED PLAN ISSUED SHOWING ELVATION CHANGES TO FINISH FLOOR AND SITE DRAINAGE. 1) TEMP SEDIMENT CONTROLS ARE IN PLACE AND SHOULD BE MAINTAINED THROUGHOUT THE DURATION OF CONSTRUCTION 2) ENSURE STORM WATER SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED. 3) PROVIDE A CESIGNATED CONCRETE/MATERIALS WASH OUT WHEN APPLICABLE. 4) ENSURE TRACKING OF SOIL ONTO PUBLIC ROADWAYS IS SWEPT ROUTINELY. ANY CONCERNS OR CHANGES ASSOCIATED W/ YOUR GRADING PERMIT CALL FOR RE-INSPECTION |
08/23/2010 | STORMWATER FOLLOW-UP INSP | MRUSSO | Approved | SITE IS NEARING COMPLETION, PRIOR TO FINAL GRADING APPROVAL PROVIDE A CERT STATEMENT FROM THE ENGINEER OF RECORD STATING THAT THE DRAINAGE WAYS AND RET/DET BASINS HAVE BEEN CONSTRUCTED PER THE APPROVED GRADING PLAN. ALSO SUBMIT AN AS-BUILT DRAWING TO THE CITY OF TUCSON FOR RECORDS. LOWERED ELEVATIONS ALONG SOUTH SIDE/SIDEWALK TO ALLOW FOR SURFACE DRAINAGE AWAY FROM FOUNDATION OF ADJACENT PROPERTY - WHEEL STOPS MUST BE INSTALLED AT PARKING SPOTS. NO OTHER CONCERNS AT THIS TIME/SITE IS APPROXIMATELY 80% STABILIZED |
08/23/2010 | GRADING - CHECK FOR ACTIVITY | MRUSSO | Approved | |
08/23/2010 | GRADING - INTERMEDIATE | MRUSSO | Approved | SITE IS NEARING COMPLETION, PRIOR TO FINAL GRADING APPROVAL PROVIDE A CERT STATEMENT FROM THE ENGINEER OF RECORD STATING THAT THE DRAINAGE WAYS AND RET/DET BASINS HAVE BEEN CONSTRUCTED PER THE APPROVED GRADING PLAN. ALSO SUBMIT AN AS-BUILT DRAWING TO THE CITY OF TUCSON FOR RECORDS. LOWERED ELEVATIONS ALONG SOUTH SIDE/SIDEWALK TO ALLOW FOR SURFACE DRAINAGE AWAY FROM FOUNDATION OF ADJACENT PROPERTY - WHEEL STOPS MUST BE INSTALLED AT PARKING SPOTS. NO OTHER CONCERNS AT THIS TIME |
09/02/2010 | LANDSCAPE INSPECTION | MRUSSO | Approved | SITE WAS SUBSTANTIALLY COMPLETED PER THE APPROVED PLAN |
09/02/2010 | STORMWATER FINAL INSPECTION | MRUSSO | Approved | |
09/02/2010 | GRADING - FINAL | MRUSSO | Approved | |
09/02/2010 | GRADING - TIER REV | MRUSSO | Approved |