Inspection History Details
Inspection Status: Approved
Inspection History: GRADING - INTERMEDIATE
Permit Number - T09BU00777
Inspection Description - GRADING - INTERMEDIATE
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/23/2010 | GRADING - INTERMEDIATE | Approved | SITE IS NEARING COMPLETION, PRIOR TO FINAL GRADING APPROVAL PROVIDE A CERT STATEMENT FROM THE ENGINEER OF RECORD STATING THAT THE DRAINAGE WAYS AND RET/DET BASINS HAVE BEEN CONSTRUCTED PER THE APPROVED GRADING PLAN. ALSO SUBMIT AN AS-BUILT DRAWING TO THE CITY OF TUCSON FOR RECORDS. LOWERED ELEVATIONS ALONG SOUTH SIDE/SIDEWALK TO ALLOW FOR SURFACE DRAINAGE AWAY FROM FOUNDATION OF ADJACENT PROPERTY - WHEEL STOPS MUST BE INSTALLED AT PARKING SPOTS. NO OTHER CONCERNS AT THIS TIME |
|
08/09/2010 | GRADING - INTERMEDIATE | Continued | CHANGE TO RET/DET BASIN - WATER HARVESTING AREA ON THE SOUTH SIDE OF THE BLDG. EOR AND CONTRACTOR WILL ADD A TYPE I SCUPPER TO THE SW CORNER OF THE BASIN TO ALLOW FOR DRAINAGE AND PREVENT STORM WATER FROM SITTING AGAINST THE FINISHED FOUNDATION OF THE BLDG. NO STORM WATER CONCERNS AT THIS TIME. |
|
07/16/2010 | GRADING - INTERMEDIATE | Continued | 1) NEED CLARIFICATION ON CHANGES MADE TO PERIMETER WALL AT REAR OF BLODG. WILL ADJACENT PROPERTY DRAINAGE RUN ALONG FOUNDATION OF NEW BLDG? 2) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME. |
|
06/11/2010 | GRADING - INTERMEDIATE | Continued | SOME CONCERNS ABOUT DRIVEWAY APPROACHES, SIDEWALKS AND ACCESS IN ROW. NO CHANGES TO APPROVED GRADING PLAN. 1) SWEEP UP TRACKING OFF OF PUBLIC ROADWAY ON A MORE ROUTINE BASIS. 2) RE-ESTABLISH YOUR CONCRETE/MATERIALS WASH OUT ON SITE. WASH OUT SHOULD HAVE A BIRM OR BE A DEPRESSED AREA. 3) MAINTAIN/REINSTALL SILT FENCE AS NEEDED. |
|
05/20/2010 | GRADING - INTERMEDIATE | Continued | REVISED PLAN ISSUED SHOWING ELVATION CHANGES TO FINISH FLOOR AND SITE DRAINAGE. 1) TEMP SEDIMENT CONTROLS ARE IN PLACE AND SHOULD BE MAINTAINED THROUGHOUT THE DURATION OF CONSTRUCTION 2) ENSURE STORM WATER SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED. 3) PROVIDE A CESIGNATED CONCRETE/MATERIALS WASH OUT WHEN APPLICABLE. 4) ENSURE TRACKING OF SOIL ONTO PUBLIC ROADWAYS IS SWEPT ROUTINELY. ANY CONCERNS OR CHANGES ASSOCIATED W/ YOUR GRADING PERMIT CALL FOR RE-INSPECTION |