Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING PRE-CONSTRUCTION
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/20/2010 | ENGINEERING PRE-CONSTRUCTION | Approved | REVISED PLAN ISSUED SHOWING ELVATION CHANGES TO FINISH FLOOR AND SITE DRAINAGE. 1) TEMP SEDIMENT CONTROLS ARE IN PLACE AND SHOULD BE MAINTAINED THROUGHOUT THE DURATION OF CONSTRUCTION 2) ENSURE STORM WATER SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED. 3) PROVIDE A CESIGNATED CONCRETE/MATERIALS WASH OUT WHEN APPLICABLE. 4) ENSURE TRACKING OF SOIL ONTO PUBLIC ROADWAYS IS SWEPT ROUTINELY. ANY CONCERNS OR CHANGES ASSOCIATED W/ YOUR GRADING PERMIT CALL FOR RE-INSPECTION |