Permit: T08CM02535
Permit Details
Apply Date:
07/22/2008
Applicant:
N/A
Description:
TI: WATER HEATER REPLACEMENT
Contractors:
- RAGE ELECTRIC L L C
- TUCSON PLUMBING SERVICE ,
Permit Reviews
Permit Number - T08CM02535
Permit Status: Expired
Permit Description: TI: WATER HEATER REPLACEMENT
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/22/2008 | COMMERCIAL TI | 09/24/2008 | COMPLETED |
| 09/24/2008 | COMMERCIAL TI | 11/03/2008 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T08CM02535
Permit Status: Expired
Permit Description: TI: WATER HEATER REPLACEMENT
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 07/22/2008 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Outstanding Inspections
Permit Status: Expired
Permit Number: T08CM02535
Permite Description: TI: WATER HEATER REPLACEMENT
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| BUILDING - FINAL | N/A | Not Inspected | ||
| 10/21/2009 | PLUMBING - FINAL | N/A | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) PER INSTALLATION ILLUSTRATION, A CONDENSATE TRAP IS REQUIRED 2) T & P TERMINATION REQUIRES A MINIMUM 1" AIR GAP 3) WH'S ARE 199,000 BTU INSTALL EXPANSION TANKS AS SPECIFIED ON PLAN |
Completed Inspections
Permit Status: Expired
Permit Number: T08CM02535
Permit Description: TI: WATER HEATER REPLACEMENT
Total Completed Inspections - 10
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/20/2008 | PLUMBING - INTERMEDIATE | JMILITEL | Approved | IVRS - Inspection :* CHECKED GAS PIPING, WATER PIPING AND VENT PIPING OK TO INSULATE WATER PIPING |
| 11/20/2008 | ELECTRIC - FINAL | RHOLLAND | Approved | IVRS - Inspection : The wiring is not complete or does not comply with code.| 245* 1. PROPERLY GROUND JUNCTION BOX -- NOT UNDER MOUNTING SCREW 2. FILL UNUSED OPENINGS -- NOT OLD FITTING 3. PLEASE VERIFY BOX FILL 4. NEED TO ADD ADDITIONAL ELECTRIC TO PLAN FOR LOADS AND CIRCUITS |
| 11/20/2008 | FIRE - FINAL | CSCHULTZ | Approved | |
| 11/20/2008 | ENGINEERING - FINAL | JBRUCKME | Approved | |
| 11/20/2008 | SIGN - FINAL | JYBARRA | Approved | |
| 11/20/2008 | ELECTRIC - INTERMEDIATE | RHOLLAND | Approved | IVRS - Inspection : The wiring is not complete or does not comply with code.| 245* |
| 11/21/2008 | RIGHT OF WAY - FINAL | MOTERO | Approved | PER EMAIL |
| 11/21/2008 | NPPO - FINAL | ACONNOR | Approved | N/A |
| 11/21/2008 | LANDSCAPE - FINAL | ACONNOR | Approved | N/A |
| 10/21/2009 | PLUMBING - GAS PRESSURE TEST | BBENEDON | Approved | IVRS - Inspection :* |