Permit Details

Status:
C of o
Type:
COMMERCIAL NEW
Address NEW:
5411 E WILLIAMS BL
Apply Date:
07/21/2008
Applicant:
N/A
Description:
NEW OFFICE BUILDING
Architects:
  • MORROW, KEVIN THOMAS
Contractors:
  • BARKER MORRISSEY CONTRACTING INC **C

Permit Reviews

Permit Number - T08CM02517
Permit Status: C of o
Permit Description: NEW OFFICE BUILDING
Start Date Submittal Complete Date Status  
01/28/2009 3RD PARTY REVIEW-REVISION/OTHER 01/28/2009 COMPLETED Review Details
03/09/2009 3RD PARTY REVIEW-REVISION/OTHER 03/19/2009 COMPLETED Review Details
07/21/2008 PLANS OK TO SUBMIT - 3RD PARTY 07/21/2008 COMPLETED Review Details
07/21/2008 3RD PARTY REVIEW-COMMERCIAL 09/24/2008 COMPLETED Review Details
09/24/2008 POST 3RD PARTY REVIEW 11/20/2008 COMPLETED Review Details
11/20/2008 POST 3RD PARTY REVIEW 12/03/2008 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T08CM02517
Permit Status: C of o
Permit Description: NEW OFFICE BUILDING
Total Outstanding Activity Conditions - 1
Date Name
07/21/2008 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.

Completed Inspections

Permit Status: C of o
Permit Number: T08CM02517
Permit Description: NEW OFFICE BUILDING
Total Completed Inspections - 49
Date Description Inspector Results Comments
12/11/2008 SITE - SEWER RRICH Approved IVRS - Inspection :*
12/11/2008 PLUMBING - SEWER HCS CONNECT RRICH Approved IVRS - Inspection :*
12/17/2008 PLUMBING - ROUGH, SOIL RRICH Approved IVRS - Inspection :*
PETITION OF APPEAL ON SITE #08-12-08 FOR USE OF IPC IN PLACE OF UPC PER PLAN. WITH REVISION THIS WILL NEED TO BE ON REVISED PLAN. FROM INITIAL ON P1.1 THRU TO C/O AND (3) FLOOR SINKS FOR CWV SYSTEM PER 2006 IPC WITH TRAP PRIMERS
12/17/2008 REINFORCED MASONRY PRE-GROUT GDABBS Approved IVRS - Inspection :*
12/19/2008 ELECTRIC - UFER RJIROUDE Approved IVRS - Inspection :*
1. OK 4/0 FOR CONNECTION TO LIGHTNING PROTECTION SYSTEM
2. OK U.G FOR FLOOR BOXES
3. OK GEC FOR XFMR CONNECTED TO 4/0 UFER
12/19/2008 STEM WALL/RETAINING WALL GDABBS Approved IVRS - Inspection :*
STAIRWELL STEM WALL
@ 5.5/A.0 TO 6.5/A.0 SPECIAL INSPECTED
12/19/2008 ELECTRIC - UNDERGROUND RJIROUDE Approved IVRS - Inspection :*
12/22/2008 PLUMBING - PRE SLAB RRICH Approved IVRS - Inspection :*
FROM LINE C NORTH PRE-SLAB OK 4" RWL WATER TEST
TO 2' AFF FOR SOUTHEAST CORNER
12/22/2008 PLUMBING - ROOF DRAINS RRICH Approved IVRS - Inspection :*
12/31/2008 EXCAVATION/LAYOUT REBAR & ZON GDABBS Approved IVRS - Inspection :*
1) CONCRETE PIER CAP FOOTING AT GRID E.0/1.0-SPECIAL INSPECTED
12/31/2008 BUILDING PRE-SLAB GDABBS Approved IVRS - Inspection :*
1) REINFORCING BAR FOR PRE-SLAB A GRID LOCATIONS FROM 1.0/A.0 TO 8.0/A.0 SOUTH TO 1.0/C.0 TO 8.0/C.0 OK-SPECIAL INSPECTED
01/22/2009 RIGHT OF WAY - FINAL MCASTRO Approved
03/02/2009 PLUMBING - GAS PRESSURE TEST RRICH Approved IVRS - Inspection :*
FROM METER THRU TO CAPS ON ROOF PER DELTA 4
BLUE PAGES REVISION WHICH WILL NEED C.O.T APPROVAL
03/18/2009 FIRE SPKLR - UG PIPING FLUSH LTHOMAS Approved
04/06/2009 STUCCO MESH GDABBS Approved IVRS - Inspection :*
04/06/2009 ROOF NAILING GDABBS Approved IVRS - Inspection :*
04/16/2009 TEP CLEARANCE - AM JWEATHER Approved TEC CLEARED PER R. JIROUDEK
04/20/2009 PLUMBING - ABOVE CEILING RRICH Approved IVRS - Inspection :*
PLEASE CALL IN 03005, 03035, 03040 FOR APPROVAL
04/20/2009 PLUMBING - GAS PRESS TEST FNL RRICH Approved IVRS - Inspection :*
04/20/2009 FIRE SPKLR - OH PIPING & HYDRO LTHOMAS Approved
04/21/2009 PLUMBING - YARD WTR LINE/TEST RRICH Approved IVRS - Inspection :*
04/27/2009 BUILDING ABOVE CEILING GDABBS Approved IVRS - Inspection :*
GRID COMPLETE
05/05/2009 SIGN - FINAL JYBARRA Approved
05/05/2009 ELECTRIC - CABLE DROP RJIROUDE Approved IVRS - Inspection :*
05/05/2009 ELECTRIC - ABOVE CEILING RJIROUDE Approved IVRS - Inspection :*
05/05/2009 ELECTRIC - INTERMEDIATE RJIROUDE Approved IVRS - Inspection :*
05/05/2009 SHEET ROCK NAILING GDABBS Approved IVRS - Inspection :*
05/05/2009 U VALUE FOR WINDOW GDABBS Approved IVRS - Inspection :*
05/05/2009 FRAMING GDABBS Approved IVRS - Inspection :*
05/05/2009 EXT METAL CLIPS/EXT SHEATHING GDABBS Approved IVRS - Inspection :*
05/06/2009 PLUMBING - INTERMEDIATE BBENEDON Approved IVRS - Inspection :*
05/07/2009 FUEL TANK FINAL 791-4502 CFUNKE Approved Approved. Refer to T08BU01991
05/08/2009 MECHANICAL - ABOVE CEILING JMILITEL Approved IVRS - Inspection :*
COPPER DRAIN LINES PENETRATING CABINET OF FAN COILS MUST BE PROTECTED AT KNOCKOUT.
NEED AIR BALANCE REPORT
NEED DUCT SMOKE DETECTOR TEST
05/11/2009 FIRE - ALARM FINAL LTHOMAS Approved
05/11/2009 FIRE SPKLR - FINAL LTHOMAS Approved
05/11/2009 FIRE SPKLR - UG, PIPING, HYDRO LTHOMAS Approved
05/13/2009 MECHANICAL - INTERMEDIATE JMILITEL Approved IVRS - Inspection :*
05/14/2009 MECHANICAL - FINAL JMILITEL Approved IVRS - Inspection :*
05/15/2009 PLUMBING - FINAL RMYERS Approved IVRS - Inspection :*
1) PLUMBING FINAL OK
05/18/2009 FIRE - FINAL LTHOMAS Approved PER INSP COPY
05/19/2009 NPPO - FINAL ACONNOR Approved
05/19/2009 LANDSCAPE - FINAL ACONNOR Approved
10/27/2009 ELECTRIC - FINAL RJIROUDE Approved IVRS - Inspection :*
10/27/2009 ELECTRIC - TEMP POWER FOR TEST RJIROUDE Approved IVRS - Inspection :*
10/27/2009 OUTDOOR LIGHTING FINAL RJIROUDE Approved IVRS - Inspection :*
10/27/2009 ELECTRIC - OUTDOOR LIGHTING RJIROUDE Approved IVRS - Inspection :*
10/27/2009 ENGINEERING - FINAL JFEMLING Approved All items complete, approved.
10/30/2009 PERMIT FINALED JWEATHER Approved
10/30/2009 BUILDING - FINAL GDABBS Approved IVRS - Inspection :*