Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
Permit Number - T08CM02517
Inspection Description - ENGINEERING - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/27/2009 | ENGINEERING - FINAL | Approved | All items complete, approved. | |
06/05/2009 | ENGINEERING - FINAL | Not ready for Inspection | Meet with contractor to review HC parking and bike parking locations, he will call for final grading insp. when ready. | |
05/15/2009 | ENGINEERING - FINAL | Not ready for Inspection | FENCING NOT COMPLETE | |
05/15/2009 | ENGINEERING - FINAL | Correction Required | IF APPROVED BY BLDG INSPECTOR OK FOR TEMP C OF O | |
05/14/2009 | ENGINEERING - FINAL | Not ready for Inspection | WALKED SITE WITH CRAIG NEW REVISION ADDRESSES BIKE PARKING WAITING FOR NEW PLANS TO BE APPROVED |
|
05/13/2009 | ENGINEERING - FINAL | Not ready for Inspection | PRELIMINARY PUNCH LIST INCLUDES: 1. PLACE BIKE LOCKERS/PARKING PER PLAN 2. STABILIZE ALL DISTURBED AREAS (N OF BLDG) 3. COMPLETE WORK ON SCUPPER N SIDE OF BLDG 4. H/C PARKING S SIDE OF BLDG NOT IN COMPLIANCE 5. ADDRESS PONDING IN H/C PARKING/ACCESS ISLES |
|
05/05/2009 | ENGINEERING - FINAL | Not ready for Inspection | MET WITH CRAIG AND BRIAN FOR TEMP C OF O: ALL PUBLIC ACCESS TO BE LIMITED-NOT ALLOWING ACCESS TO S SIDE OF SITE INCLUDING LAY DOWN YARD, TRAILER, ETC. |
|
05/04/2009 | ENGINEERING - FINAL | Not ready for Inspection | CONTRACTOR NEEDS TO COMPLETE ALL WORK AND ADDRESS SAFETY CONCERNS. WILL CALL NICHOLE FOR REINSPECTION. | |
04/13/2009 | ENGINEERING - FINAL | Continued | LFT MSG FOR CRAIG 260-0498 |