Permit: T08CM02312
Permit Details
Apply Date:
06/30/2008
Applicant:
N/A
Description:
ADDITION:GARAGE R1: CHANGE TO FRAMING DETAIL R2: ADD WASHER & DRYER IN GARAGE
Permit Reviews
Permit Number - T08CM02312
Permit Status: Final
Permit Description: ADDITION:GARAGE
R1: CHANGE TO FRAMING DETAIL
R2: ADD WASHER & DRYER IN GARAGE
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/04/2009 | REVISION - - 1ST | 09/22/2009 | COMPLETED |
| 06/30/2008 | RESIDENTIAL BLDG/ZONING/ENGINE/WWM | 06/30/2008 | COMPLETED |
| 06/30/2008 | RESIDENTIAL BLDG/WWM | 08/04/2008 | COMPLETED |
| 09/22/2009 | REVISION - - 2ND | 09/22/2009 | COMPLETED |
| 12/12/2008 | RESUBMITTAL | 01/16/2009 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T08CM02312
Permit Status: Final
Permit Description: ADDITION:GARAGE
R1: CHANGE TO FRAMING DETAIL
R2: ADD WASHER & DRYER IN GARAGE
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 06/30/2008 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: Final
Permit Number: T08CM02312
Permit Description: ADDITION:GARAGE
R1: CHANGE TO FRAMING DETAIL
R2: ADD WASHER & DRYER IN GARAGE
Total Completed Inspections - 23
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/23/2009 | PLUMBING - PRE SLAB | EDURAZO | Approved | IVRS - Inspection :* |
| 04/23/2009 | PLUMBING - ROUGH, SOIL | EDURAZO | Approved | IVRS - Inspection :* |
| 04/28/2009 | ELECTRIC - UFER | WNORTH | Approved | IVRS - Inspection :* 1) LOCATION IS EAST ON ALLEY SOUTH OF RESIDENCE |
| 04/28/2009 | BUILDING PRE-SLAB | WNORTH | Approved | PER CONVERSATION WITH CLAYTON TREVILLYAN ON 4/28/09 AT 3:19 PM. CLAYTON STATED THAT HE SPOKE TO W. NORTH, WHOM WAS GOING BACK THIS AFTERNOON TO PERFORM THIS INSPECTION |
| 04/28/2009 | EXCAVATION/LAYOUT REBAR & ZON | WNORTH | Approved | IVRS - Inspection :* |
| 05/20/2009 | ROOF NAILING | DWALKER | Approved | IVRS - Inspection :* |
| 05/22/2009 | EXT METAL CLIPS/EXT SHEATHING | DWALKER | Approved | IVRS - Inspection :* |
| 06/01/2009 | U VALUE FOR WINDOW | WNORTH | Approved | IVRS - Inspection :* |
| 06/01/2009 | STUCCO MESH | WNORTH | Approved | IVRS - Inspection :* |
| 09/08/2009 | MECHANICAL - INTERMEDIATE | EDURAZO | Approved | IVRS - Inspection :* |
| 09/23/2009 | PLUMBING - ROOF DRAINS | JBURGE | Approved | IVRS - Inspection :* 1) 2-4" DRAINS PER ROOF PLAN 2) ADDITIONAL OUTLET AND CONTROL SWITCH ADDED TO ENTRY SCREEN WALL-NOT ON PLANS |
| 09/23/2009 | PLUMBING - INTERMEDIATE | JBURGE | Approved | IVRS - Inspection :* 1) AS PER PLAN REVISION DATED (9/22/09) |
| 09/23/2009 | ELECTRIC - INTERMEDIATE | JBURGE | Approved | IVRS - Inspection :* 1) DEDICATED CIRCUIT ADDED FOR DRYER-REVISION (9/22/09) |
| 09/23/2009 | FRAMING | JBURGE | Approved | IVRS - Inspection :* 1) OK TO SHEETROCK ALL AREAS |
| 12/28/2009 | SHEET ROCK NAILING | JWEATHER | Approved | CANCELLED PER HOMEOWNER KELLY POTTER #631-5412 |
| 03/25/2010 | SITE - SEWER | EDURAZO | Approved | IVRS - Inspection :* |
| 03/25/2010 | PLUMBING - YARD WTR LINE/TEST | EDURAZO | Approved | IVRS - Inspection :* |
| 06/14/2011 | MECHANICAL - FINAL | DQUINN | Approved | IVRS - Inspection :* |
| 06/14/2011 | ELECTRIC - OUTDOOR LIGHTING | DQUINN | Approved | IVRS - Inspection :* |
| 06/27/2011 | PLUMBING - FINAL | DQUINN | Approved | IVRS - Inspection :* |
| 07/07/2011 | ELECTRIC - FINAL | DQUINN | Approved | IVRS - Inspection :* |
| 07/11/2011 | PERMIT FINALED | JWEATHER | Approved | |
| 07/11/2011 | BUILDING - FINAL | DQUINN | Approved | IVRS - Inspection :* |