Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
C of o
Type:
MULTI FAMILY NEW
Apply Date:
06/03/2008
Applicant:
N/A
Description:
NEW: APARTMENT BUILDING #1
Contractors:
  • K AND S II LIMITED ,

Permit Reviews

Permit Number - T08CM01826
Permit Status: C of o
Permit Description: NEW: APARTMENT BUILDING #1
Start Date Submittal Complete Date Status  
01/12/2010 REVISION - - 2ND 01/12/2010 ACTIVE Review Details
05/11/2009 REVISION - - 1ST 05/20/2009 COMPLETED Review Details
06/03/2008 PLANS OK TO SUBMIT - 3RD PARTY 06/04/2008 COMPLETED Review Details
06/04/2008 3RD PARTY REVIEW-COMMERCIAL 09/08/2008 COMPLETED Review Details
09/08/2008 POST 3RD PARTY REVIEW 10/06/2008 COMPLETED Review Details
12/15/2008 RESUBMITTAL 04/07/2009 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T08CM01826
Permit Status: C of o
Permit Description: NEW: APARTMENT BUILDING #1
Total Outstanding Activity Conditions - 1
Date Name
06/03/2008 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.

Completed Inspections

Permit Status: C of o
Permit Number: T08CM01826
Permit Description: NEW: APARTMENT BUILDING #1
Total Completed Inspections - 39
Date Description Inspector Results Comments
06/30/2009 ELECTRIC - UFER RMORENO Approved IVRS - Inspection :*
BLDG 1: UFER, 2 ISLAND UNDERGROUND-OK
06/30/2009 PLUMBING - ROUGH, SOIL RLEDONNE Approved IVRS - Inspection :*
06/30/2009 ELECTRIC - UNDERGROUND RMORENO Approved IVRS - Inspection :*
07/01/2009 BUILDING PRE-SLAB JBURGE Approved IVRS - Inspection :*
1) COMPLETED-OK TO POUR PROGRESS AREAS
07/01/2009 EXCAVATION/LAYOUT REBAR & ZON JBURGE Approved IVRS - Inspection :*
1) POST TENSION SYSTEM; FOOTINGS PER DETAILS #113 & 114
08/10/2009 EXT METAL CLIPS/EXT SHEATHING JBURGE Approved IVRS - Inspection :*
1) STRAPS AND HOLDOWNS IN PLACE PER PLANS-OK TO COVER EXTERIOR-APPROVED
08/10/2009 ROOF NAILING JBURGE Approved IVRS - Inspection :*
1) OK TO DRY IN
08/27/2009 MECHANICAL - ABOVE CEILING JMILITEL Approved IVRS - Inspection :*
1) 2ND FLOOR OK FOR INSULATION AND SHEETROCK AT HALLWAY
2) 1ST FLOOR ALSO OK
3) DRYER VENTS OK
09/15/2009 PLUMBING - INTERMEDIATE RRICH Approved IVRS - Inspection :*.
1) LOOKED AT HCS CONNECTION FOR BLDG 3 WHICH HAS HUB SETS INSTALLED TO PREVENT FLOW. CONTRACTOR IS AWARE OF NO FLOW ON SITE SEWER UNTIL APPROVAL
10/02/2009 PLUMBING - SEWER HCS CONNECT RRICH Approved IVRS - Inspection :*
10/16/2009 MECHANICAL - INTERMEDIATE JMILITEL Approved IVRS - Inspection :*
1) OK FOR SHEETROCK
10/16/2009 ELECTRIC - INTERMEDIATE RMORENO Approved IVRS - Inspection :*
1) FIRST FLOOR WALLS, SECOND FLOOR WALLS AND HARD LIDS OK
10/19/2009 U VALUE FOR WINDOW JBURGE Approved IVRS - Inspection :*
10/19/2009 BUILDING ABOVE CEILING JBURGE Approved IVRS - Inspection :*
10/19/2009 FRAMING JBURGE Approved IVRS - Inspection :*
11/13/2009 ELECTRIC - CABLE DROP RMORENO Approved IVRS - Inspection :*
1) LADERAL TO METER BASE OK
11/18/2009 SHEET ROCK NAILING JBURGE Approved IVRS - Inspection :*
1) 1ST FLOOR COMPLETE-OK TO TAPE
12/04/2009 STUCCO MESH JBURGE Approved IVRS - Inspection :*
1) OK TO STUCCO
12/11/2009 PLUMBING - PROGRESS BBENEDON Approved IVRS - Inspection :*
12/15/2009 ELECTRIC - TEMPORARY SERVICE JJAWORSKY Approved IVRS - Inspection :
See detailed listing on site.| 999*
1) MUST POST BOND FIRST
12/16/2009 PLUMBING - YARD WTR LINE/TEST BBENEDON Approved IVRS - Inspection :*
12/17/2009 PLUMBING - ABOVE CEILING BBENEDON Approved IVRS - Inspection :*
12/22/2009 BUILDING - PROGRESS JBURGE Approved IVRS - Inspection :*
1) WEST SCREEN WALL NW PORTION APPROX. 234 L.F. BOND BEAM AT 32" OK TO GROUT PROGRESS AREAS
03/05/2010 ELECTRIC - OUTDOOR LIGHTING RJIROUDE Approved IVRS - Inspection :*
03/05/2010 ELECTRIC - CONSTRUCTION POWER RJIROUDE Approved IVRS - Inspection :*
03/09/2010 TEP CLEARANCE - AM JWEATHER Approved TEC CLEARED FOR #1101,1102,1103,1104,1201,102,1203,1204 AND OWNER B1 PER R. JIROUDEK-SENT OVER TO TEP ON 03/08/10 IN THE AM PER D. ROBEY
03/26/2010 MECHANICAL - FINAL JMILITEL Approved IVRS - Inspection :*
1) OK FOR FINAL
03/26/2010 ELECTRIC - ABOVE CEILING RMORENO Approved
03/26/2010 ELECTRIC - FINAL RMORENO Approved IVRS - Inspection :*
04/05/2010 PLUMBING - FINAL BBENEDON Approved IVRS - Inspection :*
1) LABEL ELECTRICAL PANELS
2) CHECK AND ADJUST PRV'S AS NEEDED ON ALL BLDGS
3) HANDLES BURIED
4) PROPER CLEANOUT PLUGS/COVERS AT KS'S
04/08/2010 FIRE - HYDRANTS LThomas Approved Approved 4/8/10
04/08/2010 FIRE SPKLR - FINAL LThomas Approved Approved 4/8/10
04/08/2010 FIRE - FINAL LThomas Approved Approved 4/8/10
04/19/2010 BUILDING - FINAL GDABBS Approved IVRS - Inspection :*
04/19/2010 SIGN - FINAL JYBARRA Approved
04/27/2010 NPPO - FINAL ACONNOR Approved
05/27/2010 LANDSCAPE - FINAL MRUSSO Approved
05/27/2010 ENGINEERING - FINAL MRUSSO Approved
07/22/2010 RIGHT OF WAY - FINAL PWhiddon Approved

Documents

File Name Document Type  
C OF O_12-10-2010.TIF CERT OF OCC VIEW
None DOCUMENTS VIEW