Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Final
Type:
COMMERCIAL OTHER
Address NEW:
6300 E SPEEDWAY BL
Apply Date:
07/24/2007
Applicant:
OPUS SOUTHWEST CONSTRUCTION CORP
Description:
SITE SEWER
Contractors:
  • OPUS SOUTHWEST CONSTRUCTION CORP

Permit Reviews

Permit Number - T07PL01332
Permit Status: Final
Permit Description: SITE SEWER
Start Date Submittal Complete Date Status  
07/24/2007 PLUMBING 07/24/2007 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T07PL01332
Permit Status: Final
Permit Description: SITE SEWER
Total Outstanding Activity Conditions - 1
Date Name
07/24/2007 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.

Completed Inspections

Permit Status: Final
Permit Number: T07PL01332
Permit Description: SITE SEWER
Total Completed Inspections - 6
Date Description Inspector Results Comments
07/30/2007 SEWER - PRE CONSTRUCTION MTG BBENEDON Approved IVRS - Inspection :*
- CONTRACTOR SHALL COMPLY W/ALL PLAN NOTES
C.O.T APPROVED 7/24/07
- PRIVATE SEWER SHALL BE INSTALLED PER PCWM STANDARDS
- PRIVATE SEWER SHALL BE INSPECTED BY CITY OF TUCSON
- DSD PLUMBING INSPECTOR AND BY ENGINEER
- ALL PRIVATE MANHOLES REQUIRE INSPECTION OF BASE AND OF CONNECTION TO MH
- PLUMBING INSPECTOR SHALL WITNESS TESTING OF SEWER AND MANHOLES
- PLUMBING INSPECTOR SHALL INSPECT ALL PIPING PRIOR TO CONCEALMENT.
- CONTRACTOR MAY CHOOSE TO AIR TEST AFTER CONCEALMENT BUT CONTRACTOR WILL BE COVERING AT OWN RISK IF CHOOSING TO COVER FIRST AND TEST W/AIR AT LATER DATE.
- TRACER WIRE IS REQUIRED. PIPE IS PVC SDR 35
- VERIFICATION OF GRADE AND ENGINEERS TEST RESULTS AS REQUIRED BY PLAN NOTES REQUIRED FOR FINAL APPROVAL.
- CALL FOR INSPECTION DAILY DURING INSTALLATION
- AUTHORIZATION TO DISCHARGE REQUIRE PRIOR TO HCS FROM BUILDINGS.
- TOM & ZEE W/OPUS PRESENT FOR PRE-CON
- RICK W/GILA CONTRACTORS
08/13/2007 PLUMBING - ROUGH, SOIL BBENEDON Approved RICHARD W/AZ COM INSTALLING PVC BUILDING DEVICES
WILL WATER TEST
09/17/2007 PLUMBING - SEWER HCS CONNECT BBENEDON Approved IVRS - Inspection :*
CONNECTION AT B OK
09/26/2007 SITE - SEWER BBENEDON Approved IVRS - Inspection :*
MH #4 TEST OK
05/08/2008 PLUMBING - FINAL BBENEDON Approved
05/09/2008 PERMIT FINALED BFLORES Approved

Documents

File Name Document Type  
None DOCUMENTS VIEW
T07PL01332_001.TIF CONSTRPLANS VIEW
T07PL01332_002.TIF CONSTRPLANS VIEW
T07PL01332_003.TIF CONSTRPLANS VIEW
T07PL01332_004.TIF CONSTRPLANS VIEW