Permit: T07PL01332

Parcel: 13320129D


Addresses:

6300 E SPEEDWAY BL

Inspection Status: Approved

Inspection History: SEWER - PRE CONSTRUCTION MTG

Date Description Inspector Results Comments
05/08/2008 SEWER - PRE CONSTRUCTION MTG Approved
07/30/2007 SEWER - PRE CONSTRUCTION MTG Partial Approval IVRS - Inspection :*
- CONTRACTOR SHALL COMPLY W/ALL PLAN NOTES
C.O.T APPROVED 7/24/07
- PRIVATE SEWER SHALL BE INSTALLED PER PCWM STANDARDS
- PRIVATE SEWER SHALL BE INSPECTED BY CITY OF TUCSON
- DSD PLUMBING INSPECTOR AND BY ENGINEER
- ALL PRIVATE MANHOLES REQUIRE INSPECTION OF BASE AND OF CONNECTION TO MH
- PLUMBING INSPECTOR SHALL WITNESS TESTING OF SEWER AND MANHOLES
- PLUMBING INSPECTOR SHALL INSPECT ALL PIPING PRIOR TO CONCEALMENT.
- CONTRACTOR MAY CHOOSE TO AIR TEST AFTER CONCEALMENT BUT CONTRACTOR WILL BE COVERING AT OWN RISK IF CHOOSING TO COVER FIRST AND TEST W/AIR AT LATER DATE.
- TRACER WIRE IS REQUIRED. PIPE IS PVC SDR 35
- VERIFICATION OF GRADE AND ENGINEERS TEST RESULTS AS REQUIRED BY PLAN NOTES REQUIRED FOR FINAL APPROVAL.
- CALL FOR INSPECTION DAILY DURING INSTALLATION
- AUTHORIZATION TO DISCHARGE REQUIRE PRIOR TO HCS FROM BUILDINGS.
- TOM & ZEE W/OPUS PRESENT FOR PRE-CON
- RICK W/GILA CONTRACTORS