Inspection History Details
Inspection Status: Approved
Inspection History: SEWER - PRE CONSTRUCTION MTG
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/08/2008 | SEWER - PRE CONSTRUCTION MTG | Approved | ||
| 07/30/2007 | SEWER - PRE CONSTRUCTION MTG | Partial Approval | IVRS - Inspection :* - CONTRACTOR SHALL COMPLY W/ALL PLAN NOTES C.O.T APPROVED 7/24/07 - PRIVATE SEWER SHALL BE INSTALLED PER PCWM STANDARDS - PRIVATE SEWER SHALL BE INSPECTED BY CITY OF TUCSON - DSD PLUMBING INSPECTOR AND BY ENGINEER - ALL PRIVATE MANHOLES REQUIRE INSPECTION OF BASE AND OF CONNECTION TO MH - PLUMBING INSPECTOR SHALL WITNESS TESTING OF SEWER AND MANHOLES - PLUMBING INSPECTOR SHALL INSPECT ALL PIPING PRIOR TO CONCEALMENT. - CONTRACTOR MAY CHOOSE TO AIR TEST AFTER CONCEALMENT BUT CONTRACTOR WILL BE COVERING AT OWN RISK IF CHOOSING TO COVER FIRST AND TEST W/AIR AT LATER DATE. - TRACER WIRE IS REQUIRED. PIPE IS PVC SDR 35 - VERIFICATION OF GRADE AND ENGINEERS TEST RESULTS AS REQUIRED BY PLAN NOTES REQUIRED FOR FINAL APPROVAL. - CALL FOR INSPECTION DAILY DURING INSTALLATION - AUTHORIZATION TO DISCHARGE REQUIRE PRIOR TO HCS FROM BUILDINGS. - TOM & ZEE W/OPUS PRESENT FOR PRE-CON - RICK W/GILA CONTRACTORS |