Address Search: 6300 E SPEEDWAY BL
Search
Parcel Attributes
| Parcel | 13320129D |
|---|---|
| Jurisdiction | Tucson, Pima County |
| Water Course | Street |
| City of Tucson Zoning | C-2, C-1 |
| Tucson Ward | Ward 2 |
| Tucson Registered Neighborhood | Harold Bell Wright Estates |
| Major Street & Route | Arterial or Collector |
| Pima County Data | Assessor, Recorder, Treasurer, ... |
| Parcel Map | Map |
| Parcel Attributes Issue? | |
Historic Records Requests
Address: 6300 E SPEEDWAY BL
Date - 05/26/2026 8:45 p.m.
Total Number Of Historic Records Requests - (2)
| Name | Action |
|---|---|
| Address: 6300 E SPEEDWAY BL - Doc Type: CERT OF OCC | |
| Address: 6300 E SPEEDWAY BL - Doc Type: CERT OF OCC |
Annexations & Original City Zoning (OCZ)
Address: 6300 E SPEEDWAY BL
Date - 05/26/2026 8:45 p.m.
Total Number Of Annexations & Original City Zoning (1)
Rezoning Cases
Date - 05/26/2026 8:45 p.m.
Total Number Of Rezone Cases - (1)
| Case No. | Description | New Zone | Status | Status Date |
|---|---|---|---|---|
| C9-72-02 | Granoff - Speedway | C-2 | Effectuated | 08/21/2006 |
Special Development Requests & Requirements
Address: 6300 E SPEEDWAY BL
Date - 05/26/2026 8:45 p.m.
Total Number Of Special Development Permits - (4)
| Activity Number | Status | Apply Date | Expired Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| H000002070 | CLOSED | 09/17/2009 | N/A | Historical Information | ||
| T10SA00337 | COMPLETE | 08/31/2010 | N/A | Zoning Adminstration Letter | ||
| T13SA00352 | COMPLETE | 12/12/2013 | N/A | Zoning Adminstration Letter | ||
| T14SA00367 | COMPLETE | 11/04/2014 | N/A | Zoning Adminstration Letter |
Permits
Address: 6300 E SPEEDWAY BL
Date - 05/26/2026 8:45 p.m.
Total Number Of Permits - (56)
| Permit | Status | Apply Date | Expired Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| TC-COM-1222-00341 | Withdrawn | 12/20/2022 | 06/18/2023 | Commercial Building | Replacement of 6" backflow. Meter #07000182 | |
| DS08-49 | Approved | 10/20/2008 | N/A | Zoning Compliance | 6300 E SPEEDWAY BLVD - 6300 E SPEEDWAY BLVD - DS 3-05.0.2.2.B-1 | |
| D06-0034 | Approved | 08/16/2006 | N/A | Development Package | HERMOSA VILLAGE SENIOR APARTMENTSOriginal approval date was 3/21/2007 | |
| TR-UTL-0623-01936 | Complete | 06/30/2023 | 09/09/2023 | Right-of-Way (ROW) - Utility | N.956130 - ACCESS MH 20840 & MH 19920 FOR SPLICING. (ACCESS OF MH 21034 & MH 21354 APPROVED ON PREVIOUS PERMITS, TR-UTL-0623-01716 & TR-UTL-0623-01717, RESPECTIVELY) | |
| TC-COM-0526-00692 | In Review | 05/11/2026 | N/A | UNIT 1106 | Commercial Building | Exterior wall repair, due to vehicle strike. Like-for-like repair...stucco, framing...no concrete work. |
| TR-ROW-0526-00550 | In Review | 05/07/2026 | N/A | Right-of-Way (ROW) | Dirt Trench 100 ft move existing vault to new location, place 2" conduit for First Digital fiber | |
| TC-COM-0426-00630 | Fees Due | 04/28/2026 | N/A | Commercial Building | Replace 15 TON kitchen unit from 2009 | |
| TC-COM-0326-00370 | Issued | 03/16/2026 | 09/21/2026 | Commercial Building | re-pipe of the domestic hot and cold water for a 3-story assisted living center | |
| TR-UTL-0325-00413 | Complete | 03/11/2025 | 04/19/2025 | Right-of-Way (ROW) - Utility | wo#2911563 6300 e speedway bl 14-15-07 ne replace hydrant north side of lot between sidewalk and curb in dirt 4LF/sc | |
| TR-UTL-0226-00266 | Complete | 02/12/2026 | 03/25/2026 | Right-of-Way (ROW) - Utility | Fire Hydrant Replacement | |
| TZ-CMP-0225-00021 | Complete | 02/07/2025 | N/A | Zoning Compliance | Please provide a Zoning Verification Letter and copies of any current open/unresolved Zoning Code Violations, and any Variances, Rezone cases, and Special/Conditional Use Permits that may be on file. | |
| TF-FOP-0126-00036 | Assigned | 01/08/2026 | 04/16/2027 | Fire Operational Permit | slf i2 135 | |
| T06CM06423 | C OF O | 12/21/2006 | 05/16/2009 | COMBO | SENIOR LIVING 205 UNITS TCO FOR TENANT OCCUPANCY | |
| T07AN00381 | ISSUED | 05/03/2007 | N/A | ADDRNEW | ||
| T07BU01436 | FINAL | 07/02/2007 | 03/09/2008 | SPKLR | 380 ft of 6 in underground | |
| T07BU01476 | WITHDRWN | 07/09/2007 | N/A | TEMP-FBB | TEMP CONSTRUCTION TRAILER | |
| T07BU02005 | FINAL | 09/21/2007 | 04/19/2009 | SPKLR | Add 4056 fire sprinklers | |
| T07BU02601 | FINAL | 12/17/2007 | 04/19/2009 | BUILD | NEW FIRE ALARM SYSTEM | |
| T07BU02681 | FINAL | 12/28/2007 | 05/04/2009 | POOL/SPA | SEMI-PUBLIC POOL,SPA & FOUNTAIN | |
| T07CM02886 | CLOSED | 07/09/2007 | 08/26/2008 | COMBO | TEMP CONSTRUCTION TRAILER | |
| T07CM04447 | WITHDRWN | 11/26/2007 | N/A | COMBO | GATE FOR APTS COMPLEX | |
| T07CM04765 | FINAL | 12/19/2007 | 03/31/2009 | COMBO | ADDT: PARKING CANOPY (5) | |
| T07EL01315 | WITHDRWN | 07/16/2007 | N/A | ELECT | TEMP SERVICE 200AMP OVERHEAD FOR CONSTRUCTION | |
| T07EX00725 | CLOSED | 07/13/2007 | 09/11/2007 | EXCAV | TRENCHING 20' IN DIRT FOR 6' FIRE SERVICE & SYSTEM | |
| T07OT02531 | FINAL | 11/07/2007 | 11/25/2008 | SIGN | 13989 | |
| T07PL01025 | WITHDRWN | 06/11/2007 | N/A | PLUMB | PRIVATE SEWER | |
| T07PL01332 | FINAL | 07/24/2007 | 11/04/2008 | PLUMB | SITE SEWER | |
| T08BU01148 | FINAL | 06/23/2008 | 04/14/2009 | BUILD | KITCHEN HOOD FIRE SYSTEM | |
| T08CM00575 | CLOSED | 02/20/2008 | 08/27/2008 | COMBO | ELEC FOR TEMP LEASING TRAILER | |
| T08CM00794 | FINAL | 03/11/2008 | 05/04/2009 | COMBO | WATER FOUNTAIN | |
| T08CM02588 | FINAL | 07/28/2008 | 05/05/2009 | COMBO | FRONT 3-TIERED PRE-FAB FOUNTAIN | |
| T08EX00220 | CLOSED | 03/05/2008 | 05/04/2008 | EXCAV | EXCAVATION OF 10' IN DIRT FOR QWEST | |
| T08EX00549 | CLOSED | 07/01/2008 | 08/30/2008 | EXCAV | 50' SW AREA | |
| T08OT00699 | FINAL | 03/26/2008 | 11/12/2008 | SIGN | 14672 | |
| T08OT01294 | FINAL | 05/28/2008 | 03/28/2009 | SIGN | 15070 | |
| T08OT01784 | FINAL | 07/25/2008 | 11/03/2010 | SIGN | 15365 | |
| T09CM01486 | C OF O | 06/10/2009 | 11/03/2010 | COMBO | TI AND C OF O:SENIOR APARTMENTS | |
| T09OT00066 | FINAL | 01/13/2009 | 10/03/2009 | SIGN | 16159 | |
| T10MS00215 | ISSUED | 08/31/2010 | N/A | MISC | COPIES | |
| T11CM01462 | C OF O | 05/13/2011 | 08/20/2012 | COMBO | BUILDING "B & D" CHANGE OF OCCUPANCY -ASSISTED LIVING | |
| T12BU00111 | FINAL | 01/24/2012 | 08/06/2012 | SPKLR | Relocate 2, cap 1 fire sprinklers | |
| T12BU00189 | FINAL | 02/06/2012 | 08/07/2012 | BUILD | FIRE ALARM | |
| T14CM08252 | EXPIRED | 12/04/2014 | 02/28/2016 | COMBO | ADD 3 CARPORT CANOPIES | |
| T15TC02832 | EXPIRED | 12/31/2015 | N/A | BARRICAD | NEEDS A RTB CLOSURE FOR MAN-HOLE WORK ON WILMOT RD GOING N/BOOUND 150' S/OF SPEEDWAY BLVD. NOTE: 1150 N WILMOT WAS REQUESTED - THAT IS NOT A VALID ADDRESS | |
| T16EX01208 | EXPIRED | 04/08/2016 | 06/10/2016 | EXCAV | 8LF FRONT SOUTH WEST CORNER OF INTERSECTION EAST SPEEDWAY BLVD AND NORTH BARBARA WORTH EAST BOUND LANE ASPHALT REPAIR MAIN *** EMERGENCY *** | |
| T16RW01850 | EXPIRED | 10/04/2016 | 11/06/2016 | ROW | 120 LF WATER LINE REPAIR | |
| T16RW01995 | FINAL | 10/13/2016 | 11/09/2016 | ROW | 8 LF FRONT SOUTHWEST CORNER OF INTERSECTION OF SPEEDWAY BL AND BARBARA WORTH EASTBOUND LANE ASPHALT FOR PERMANET PATCH ON REPAIRING A MAIN WORK ORDER # 1605750 PLEASE NOTIFY SUN TRAN AT 520-623-4301 SEE NOTE # 24 | |
| T16TC00853 | EXPIRED | 04/08/2016 | N/A | BARRICAD | 8LF FRONT SOUTH WEST CORNER OF INTERSECTION EAST SPEEDWAY BLVD AND NORTH BARBARA WORTH EAST BOUND LANE ASPHALT REPAIR MAIN *** EMERGENCY *** | |
| T17CM05822 | FINAL | 07/31/2017 | 04/30/2018 | COMBO | ADDITON: CABANA | |
| T17RW00030 | FINAL | 01/03/2017 | 03/05/2017 | ROW | 120 LF IN ASPHALT FOR WATER LINE REPAIR | |
| T17RW00880 | FINAL | 02/22/2017 | 06/23/2017 | ROW | Held Order - Access a total of 6 manholes for splicing. Bore 356' of 1-futurepath, place 1-3048 handhole over existing conduit, and change out a 1248 ped to a Charles ped and pull fiber from mh 19408 to customer at 6300 E Speedway and also from mh 20840 to mh 19920. | |
| T17RW04558 | FINAL | 10/16/2017 | 11/25/2017 | ROW | CITY OF TUCSON MEDIAN PALM CARE | |
| T21RW03692 | FINAL | 08/11/2021 | 11/21/2021 | ROW | CMS-ID-21120363- ALONG N. WILMOT RD, ACCESS MH 19920 TO SPLICE EXISTING CABLE. WORK ALONG THE EAST SIDE OF N WILMOT RD, JUST SOUTH OF E BROADWAY BL. MANHOLE 19920 NEAR ENTRANCE OF 6300 E BROADWAY. Proof of notification is required at the time of the preconstruction meeting. | |
| T21RW04056 | FINAL | 08/31/2021 | 10/16/2021 | ROW | LANDSCAPE MAINTENANCE SERVICES FOR MEDIANS & ROADSIDES CONTACT NO. 212536 P.O. No. 42376 PALM & TREE CARE ON MEDIAN ISLANDS ALONG WILMOT RD BETWEEN SPEEDWAY BL TO GOLF LINKS RD. ROLLING SET UP WITH MINIMUM RESTRICTIONS ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. | |
| T22RW00803 | FINAL | 03/08/2022 | 09/28/2022 | ROW | WO# 6307379 REMOVING OVERHEAD CAPACITOR. BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AND/OR BEA PAULUS AT 520-206-8826 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION. | |
| T22RW02269 | FINAL | 06/21/2022 | 10/09/2022 | ROW | PALM & TREE CARE ON COT MEDIAN ISLANDS - STREET ARTERIALS & COLLECTORS - MEDIAN ADJACENT LANES CLOSURE - ROLLING SET UP WITH MINIMUM RESTRICTIONS. WORK LOCATION IS ALONG WILMOT RD BETWEEN SPEEDWAY BL TO GOLF LINKS RD. ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
Code Enforcement
Address: 6300 E SPEEDWAY BL
Date - 05/26/2026 8:45 p.m.
Total Number Of Code Cases - (2)
| Case Number | Case Status | Entered Date | Exp Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| CE-VIO0526-01962 | Active | 05/02/2026 | UNIT 1106 | CCAR - Vehicle struck commercial building | ||
| CE-VIO0723-04644 | Closed - Unfounded | 07/19/2023 | 01/03/2024 | UNIT 1188 | RMIN - Unit 1188 -Roaches and various bugs found throughout the unit. |
Plans
Address: 6300 E SPEEDWAY BL
Date - 05/26/2026 8:45 p.m.
Total Number Of Plans - (2)
| Plan Number | Status | Application Date | Exp Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| T08BA00083 | Approved | 12/18/2008 | N/A | -- Stormwater Basin | ||
| T08BA00084 | Approved | 12/18/2008 | N/A | -- Stormwater Basin |