Permit: T07CM04237
Permit Details
Status:
Final
Type:
SINGLE FAMILY ADDITION
Address:
3040 W CAMINO CLAVELES
Address NEW:
3040 W CAMINO CLAVELES
Apply Date:
10/31/2007
Applicant:
SAINI MOHAN SINGH
Description:
ENCLOSURE:CARPORT TO BEDROOM/BATHROOM & ADDITION:GARAGE & LNDRY ROOM R1 - Add gas pack
Outstanding Activity Conditions
Permit Number - T07CM04237
Permit Status: Final
Permit Description: ENCLOSURE:CARPORT TO BEDROOM/BATHROOM & ADDITION:GARAGE & LNDRY ROOM
R1 - Add gas pack
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 10/31/2007 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: Final
Permit Number: T07CM04237
Permit Description: ENCLOSURE:CARPORT TO BEDROOM/BATHROOM & ADDITION:GARAGE & LNDRY ROOM
R1 - Add gas pack
Total Completed Inspections - 20
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/19/2007 | ELECTRIC - UNDERGROUND | CRUIZ | Approved | IVRS - Inspection :* 1) INSPECTED HCS CONNECTION TO MAIN SEWER LINE CAPPED AT 2 WAY CLEANOUT CORRECTION |
| 12/19/2007 | PLUMBING - SEWER HCS CONNECT | CRUIZ | Approved | IVRS - Inspection :* |
| 12/21/2007 | PLUMBING - ROUGH, SOIL | CRUIZ | Approved | IVRS - Inspection :* |
| 12/26/2007 | BUILDING PRE-SLAB | DQUINN | Approved | IVRS - Inspection :* |
| 12/26/2007 | EXCAVATION/LAYOUT REBAR & ZON | DQUINN | Approved | IVRS - Inspection :* |
| 02/04/2008 | ROOF NAILING | CRUIZ | Approved | IVRS - Inspection :* |
| 02/12/2008 | PLUMBING - GAS PRESSURE TEST | CRUIZ | Approved | IVRS - Inspection :* |
| 02/12/2008 | PLUMBING - INTERMEDIATE | CRUIZ | Approved | IVRS - Inspection :* |
| 03/04/2008 | MECHANICAL - INTERMEDIATE | CRUIZ | Approved | IVRS - Inspection :* |
| 03/04/2008 | ELECTRIC - INTERMEDIATE | CRUIZ | Approved | IVRS - Inspection :* |
| 03/04/2008 | U VALUE FOR WINDOW | CRUIZ | Approved | IVRS - Inspection :* |
| 03/04/2008 | EXT METAL CLIPS/EXT SHEATHING | CRUIZ | Approved | IVRS - Inspection :* |
| 03/06/2008 | STUCCO MESH | CRUIZ | Approved | IVRS - Inspection :* |
| 03/06/2008 | FRAMING | CRUIZ | Approved | IVRS - Inspection :* |
| 03/19/2008 | SHEET ROCK NAILING | CRUIZ | Approved | IVRS - Inspection :* |
| 06/06/2008 | BUILDING - FINAL | CRUIZ | Approved | IVRS - Inspection : See detailed listing on site.| 999* 1) NEED BUBBLE COVERS ON OUTSIDE GFI RECEPTACLES 2) LOWER CLEANOUTS DOWN TO GRADE WITH APPROVED CAP 3) TPR LINE TO WATER HEATER NEEDS 90 DEGREE ELBOW AND TERMINATE 6" ABOVE GROUND 4) REMOVE FLOOD LIGHT FROM FRONT OF GARAGE 5) BEDROOM RECEPTACLES NEED TO BE ON ARC-FAULT CIRCUIT AND SMOKIES 6) NEED TO COMPLETE OUTSIDE HOSE BIB WITH SIDE 7) NEED TO COMPLETE ACCESS DOWN FOR BATH TUB 8) NEED TO SEAL AROUND TOILET 9) DOOR HARDWARE NOT PER CODE REMOVE ALL DEAD BOLT LATCHES |
| 06/06/2008 | MECHANICAL - FINAL | CRUIZ | Approved | IVRS - Inspection : See detailed listing on site.| 999* |
| 06/06/2008 | PLUMBING - FINAL | CRUIZ | Approved | IVRS - Inspection : See detailed listing on site.| 999* |
| 06/06/2008 | ELECTRIC - FINAL | CRUIZ | Approved | IVRS - Inspection : See detailed listing on site.| 999* |
| 05/22/2009 | PERMIT FINALED | JWEATHER | Approved |