Inspection History Details
Inspection Status: Approved
Inspection History: EXCAVATION/LAYOUT REBAR & ZON
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/26/2007 | EXCAVATION/LAYOUT REBAR & ZON | Approved | IVRS - Inspection :* | |
| 12/24/2007 | EXCAVATION/LAYOUT REBAR & ZON | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) ALL PVC AND ABS PLASTIC PIPE NEEDS TO BE PROTECTED FROM CONCRETE 2) FOOTING NEEDS TO BE 12" INTO NATURAL GRADE PER PLAN 3) MISSING HOLDOWN FOR BRACED PANEL WALLS 4) 90 DEGREE REBAR REINFORCEMENT NOT TIED AT EXISTING GARAGE CORNER 5) REBAR NEEDS TO BE SUPPORTED BETTER ALONG EXISTING WALL |