Permit: T07CM03759
Permit Details
Apply Date:
09/17/2007
Applicant:
N/A
Description:
NEW:BEAUTY SALON
Contractors:
- GAR CONSTRUCTION L L C
Completed Inspections
Permit Status: Final
Permit Number: T07CM03759
Permit Description: NEW:BEAUTY SALON
Total Completed Inspections - 37
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/14/2008 | PLUMBING - ROUGH, SOIL | RLEDONNE | Approved | IVRS - Inspection :* |
| 03/31/2008 | PLUMBING - PRE SLAB | RLEDONNE | Approved | IVRS - Inspection :* |
| 04/01/2008 | BUILDING PRE-SLAB | MHENSON | Approved | IVRS - Inspection :* |
| 04/01/2008 | EXCAVATION/LAYOUT REBAR & ZON | MHENSON | Approved | IVRS - Inspection :* |
| 04/01/2008 | ELECTRIC - UFER | DSANTACR | Approved | IVRS - Inspection :* |
| 05/06/2008 | FRAMING | MHENSON | Approved | IVRS - Inspection :* OK TO SHEETROCK |
| 05/06/2008 | ROOF NAILING | MHENSON | Approved | IVRS - Inspection :* OK TO DRY IN |
| 05/06/2008 | EXT METAL CLIPS/EXT SHEATHING | MHENSON | Approved | IVRS - Inspection :* ADD A35 AT SOFFIT TOP PLATE TO TJI |
| 06/05/2008 | PLUMBING - ROOF DRAINS | RLEDONNE | Approved | IVRS - Inspection :* |
| 06/10/2008 | PLUMBING - YARD WTR LINE/TEST | RLEDONNE | Approved | IVRS - Inspection :* YARDWATER TEST OK FROM METER TO 5' FROM BUILDING |
| 06/16/2008 | MECHANICAL - INTERMEDIATE | MRAMBER | Approved | IVRS - Inspection :* |
| 06/16/2008 | PLUMBING - INTERMEDIATE | RLEDONNE | Approved | IVRS - Inspection :* |
| 06/18/2008 | U VALUE FOR WINDOW | MHENSON | Approved | IVRS - Inspection :* |
| 06/18/2008 | STUCCO MESH | MHENSON | Approved | IVRS - Inspection :* |
| 07/08/2008 | ELECTRIC - INTERMEDIATE | DSANTACR | Approved | IVRS - Inspection :* 1. OBTAIN WAIVER TO USE OVERHEAD SERVICE - 201 N STONE 2. OK WALLS, HARD WALLS 3. POST BOND FOR TEMP POWER FOR TEST OK TEMP CONST. POWER 4. VERIFY WATER & GAS PIPE GROUND |
| 07/17/2008 | ELECTRIC - CABLE DROP | DSANTACR | Approved | IVRS - Inspection :* OK CLEARANCE SUBJECT TO BOND POSTING TEC COMM |
| 07/17/2008 | ELECTRIC - TEMPORARY SERVICE | DSANTACR | Approved | IVRS - Inspection :* |
| 07/17/2008 | ELECTRIC - TEMPORARY POLE | DSANTACR | Approved | IVRS - Inspection :* |
| 07/23/2008 | BUILDING - FINAL | LHANLY | Approved | IVRS - Inspection :* I AM NOT PSYCHIC POST YOUR ADDRESS OK TO PLACE CONCRETE @ FRONT WALK |
| 07/23/2008 | SHEET ROCK NAILING | LHANLY | Approved | IVRS - Inspection :* |
| 08/07/2008 | PLUMBING - SEWER HCS CONNECT | RLEDONNE | Approved | IVRS - Inspection :* |
| 09/10/2008 | ENGINEERING - FINAL | NKALAHAR | Approved | MET ONSITE WITH THE CONTRACTOR THE DRIVEWAY HAS BEEN RELOCATED TO MATCH THE EXISTING DEPRESSED CURB/DRIVEWAY LOCATION. THERE IS A CONCERN WITH THE ACCESSIBLE ROUTE FROM THE ROW TO THE WEST SIDE OF THE BUILDING. INSPECTION RESULTS ARE AS FOLLOWS: ADDRESS CHANGE IN LOCATION OF DRIVEWAY AND ENSURE A 24' PAAL IS MAINTAINED ADDRESS ELEVATION DIFFERENCES FOR ADA/ACCESSIBLE ROUTE AT WEST SIDE OF SITE/BUILDING *ADDRESS SITE DIFFERENCES ON PLAN AND HAVE APPROVED BY THE CITY OF TUCSON |
| 09/11/2008 | ELECTRIC - TEMP POWER FOR TEST | DSANTACR | Approved | IVRS - Inspection :* |
| 09/12/2008 | TEP CLEARANCE - AM | JWEATHER | Approved | TEC CLEARED PER D. SANTACRUZ |
| 09/25/2008 | BUILDING - PROGRESS | MHENSON | Approved | IVRS - Inspection :* INFO. ONLY 1. REMOVE KEYED KNOBS FROM INTERIOR EXITS 2. GO TO ARCHITECT -- ACCESSIBLE ROUTE DOES NOT MEET ADA OVER 5% RAMP NOT 20' LONG - NEED REVISED PLAN |
| 09/25/2008 | ELECTRIC - PROGRESS | DSANTACR | Approved | IVRS - Inspection :* |
| 11/20/2008 | MECHANICAL - PROGRESS | MRAMBER | Approved | |
| 11/20/2008 | MECHANICAL - FINAL | MRAMBER | Approved | IVRS - Inspection :* |
| 03/03/2009 | ELECTRIC - CONSTRUCTION POWER | DSANTACR | Approved | IVRS - Inspection :* |
| 03/03/2009 | OUTDOOR LIGHTING FINAL | DSANTACR | Approved | IVRS - Inspection :* |
| 03/03/2009 | ELECTRIC - FINAL | DSANTACR | Approved | IVRS - Inspection :* |
| 03/04/2009 | ELECTRIC - OUTDOOR LIGHTING | DSANTACR | Approved | |
| 03/04/2009 | RIGHT OF WAY - FINAL | LLOPEZ | Approved | PER EMAIL |
| 03/13/2009 | PLUMBING - FINAL | RLEDONNE | Approved | IVRS - Inspection :* 1. LETTER FROM ARCHITECT FOR OK FOR CHANGES 2. WATER REPORT ON SITE |
| 03/13/2009 | PLUMBING - PROGRESS | RLEDONNE | Approved | IVRS - Inspection :* |
| 04/15/2009 | SIGN - FINAL | JYBARRA | Approved | IVRS - Inspection :* |
| 08/13/2015 | FIRE - FINAL | CSCHULTZ | Approved |