Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - INTERMEDIATE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/16/2008 | PLUMBING - INTERMEDIATE | Approved | IVRS - Inspection :* | |
| 06/12/2008 | PLUMBING - INTERMEDIATE | Not ready for Inspection | 1. PLEASE POST YOUR ADDRESS 2. IF YOU ARE USING THE HOSE BIB, INSTALL AN AVB IMMEDIATELY! 3. PLUMBER HAS NOT FOLLOWED THE PLAN 4. WHERE IS THE CLEAN OUT ON THE FOOT VENT FOR THE CHICAGO LOOP 5. SEE NOTE 24 ON P2 PLUMBING SPECS 6. ABS SHALL BE SUPPORTED AT EACH CHANGE OF DIRECTION OR ELEVATION AND AT THE END OF BRANCHES, THEN NO MORE THAN FOUR FEET BETWEEN HANGERS 7. YOU CAN SUPPORT TO THE STRUCTURE, BUT NOT BY THE STRUCTURE 8. REMOVE DEBRIS FROM YARDWATER TRENCH 9. ALL UNDERGROUND YARDWATER TO BE AT LEAST 12" OF COVER CONTINUED "NOT READY" WILL RESULT IN A REFEE |
|
| 06/05/2008 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* 1. PROVIDE INSULATION PER SPEC. #24 2. ADD SUPPORT ON ALL PIPING 3. PROTECT COPPER PIPING FROM METAL 4. PROVIDE REDLINES DRAWN FOR SMALL CHANGES 5. PROVIDE TRACER WIRE FOR YARD WATER |