Status:
Final
Type:
COMMERCIAL OTHER
Address:
45 N 5TH AV
Apply Date:
11/27/2007
Applicant:
DOWL ENGINEERS
Description:
GRADING:52500CY CUT 0CY FILL
Contractors:
  • LLOYD CONSTRUCTION COMPANY INC ,

Permit Reviews

Permit Number - T07BU02487
Permit Status: Final
Permit Description: GRADING:52500CY CUT 0CY FILL
Start Date Submittal Complete Date Status  
09/24/2010 REVISION - GRADING 09/24/2010 COMPLETED Review Details
09/24/2010 REVISION - GRADING 09/29/2010 COMPLETED Review Details
09/29/2010 REVISION - GRADING 12/15/2010 COMPLETED Review Details
11/27/2007 PLANS OK TO SUBMIT - GRADING 11/27/2007 COMPLETED Review Details
11/27/2007 GRADING 01/04/2008 COMPLETED Review Details

Completed Inspections

Permit Status: Final
Permit Number: T07BU02487
Permit Description: GRADING:52500CY CUT 0CY FILL
Total Completed Inspections - 7
Date Description Inspector Results Comments
01/29/2008 ENGINEERING PRE-CONSTRUCTION MRUSSO Approved PERFORMED STORM WATER PRE-CONSTRUCTION MEETING WITH CONTRACTOR (DON WILLIAMS 471-8421/LLOYD CONSTRUCTION), DISCUSSED SWPPP.
CONSTRUCTION PERIMETER WILL REMAIN PAVED THROUGHOUT THE DURATION OF THE PROJECT; THEREFORE SILT FENCE WILL NOT BE USED AS A BMP PER THE SWPPP.
RECOMMEND THE USE OF SILT SOCK AS A BARRIER ALONG THE SOUTH AND EAST PERIMETER.
DUE TO THE EXISTING CURB LOCATED ALONG THE WEST BOUNDRY, NO STORM WATER BMP'S ARE NEEDED.
ENSURE STABILIZED ENTRANCES/EXITS ARE USED AND TRACKING OF SOIL IS SWEPT DAILY.
03/10/2008 STORMWATER INSTALL OF CONTROLS MRUSSO Approved
06/11/2008 GRADING - CHECK FOR ACTIVITY MRUSSO Approved
10/28/2009 GRADING - INTERMEDIATE MRUSSO Approved VERY LITTLE SITE WORK ASSOCIATED W/ PROJECT
10/28/2009 STORMWATER FOLLOW-UP INSP MRUSSO Approved NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME.
11/29/2010 GRADING - FINAL MRUSSO Approved FINAL GRADING APPROVED, AN AS-BUILT DRAWING WAS SUBMITTED AND APPROVED BY ENGINEERING. INSPECTION WAS PERFORMED USING THE AS-BUILT DRAWING.
12/03/2010 PERMIT FINALED KMEDINA Approved

Documents

File Name Document Type  
APPROVED_001.TIF GRADING PLANS VIEW
APPROVED_002.TIF GRADING PLANS VIEW
APPROVED_003.TIF GRADING PLANS VIEW
APPROVED_004.TIF GRADING PLANS VIEW
None DOCUMENTS VIEW
BOND RELEASE LETTER 2010_12_17.PDF DOCUMENTS VIEW
None DOCUMENTS VIEW