Permit: T07BU02487
Permit Details
Apply Date:
11/27/2007
Applicant:
DOWL ENGINEERS
Description:
GRADING:52500CY CUT 0CY FILL
Contractors:
- LLOYD CONSTRUCTION COMPANY INC ,
Permit Reviews
Permit Number - T07BU02487
Permit Status: Final
Permit Description: GRADING:52500CY CUT 0CY FILL
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
09/24/2010 | REVISION - GRADING | 09/24/2010 | COMPLETED |
09/24/2010 | REVISION - GRADING | 09/29/2010 | COMPLETED |
09/29/2010 | REVISION - GRADING | 12/15/2010 | COMPLETED |
11/27/2007 | PLANS OK TO SUBMIT - GRADING | 11/27/2007 | COMPLETED |
11/27/2007 | GRADING | 01/04/2008 | COMPLETED |
Completed Inspections
Permit Status: Final
Permit Number: T07BU02487
Permit Description: GRADING:52500CY CUT 0CY FILL
Total Completed Inspections - 7
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/29/2008 | ENGINEERING PRE-CONSTRUCTION | MRUSSO | Approved | PERFORMED STORM WATER PRE-CONSTRUCTION MEETING WITH CONTRACTOR (DON WILLIAMS 471-8421/LLOYD CONSTRUCTION), DISCUSSED SWPPP. CONSTRUCTION PERIMETER WILL REMAIN PAVED THROUGHOUT THE DURATION OF THE PROJECT; THEREFORE SILT FENCE WILL NOT BE USED AS A BMP PER THE SWPPP. RECOMMEND THE USE OF SILT SOCK AS A BARRIER ALONG THE SOUTH AND EAST PERIMETER. DUE TO THE EXISTING CURB LOCATED ALONG THE WEST BOUNDRY, NO STORM WATER BMP'S ARE NEEDED. ENSURE STABILIZED ENTRANCES/EXITS ARE USED AND TRACKING OF SOIL IS SWEPT DAILY. |
03/10/2008 | STORMWATER INSTALL OF CONTROLS | MRUSSO | Approved | |
06/11/2008 | GRADING - CHECK FOR ACTIVITY | MRUSSO | Approved | |
10/28/2009 | GRADING - INTERMEDIATE | MRUSSO | Approved | VERY LITTLE SITE WORK ASSOCIATED W/ PROJECT |
10/28/2009 | STORMWATER FOLLOW-UP INSP | MRUSSO | Approved | NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME. |
11/29/2010 | GRADING - FINAL | MRUSSO | Approved | FINAL GRADING APPROVED, AN AS-BUILT DRAWING WAS SUBMITTED AND APPROVED BY ENGINEERING. INSPECTION WAS PERFORMED USING THE AS-BUILT DRAWING. |
12/03/2010 | PERMIT FINALED | KMEDINA | Approved |