Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING PRE-CONSTRUCTION
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/29/2008 | ENGINEERING PRE-CONSTRUCTION | Approved | PERFORMED STORM WATER PRE-CONSTRUCTION MEETING WITH CONTRACTOR (DON WILLIAMS 471-8421/LLOYD CONSTRUCTION), DISCUSSED SWPPP. CONSTRUCTION PERIMETER WILL REMAIN PAVED THROUGHOUT THE DURATION OF THE PROJECT; THEREFORE SILT FENCE WILL NOT BE USED AS A BMP PER THE SWPPP. RECOMMEND THE USE OF SILT SOCK AS A BARRIER ALONG THE SOUTH AND EAST PERIMETER. DUE TO THE EXISTING CURB LOCATED ALONG THE WEST BOUNDRY, NO STORM WATER BMP'S ARE NEEDED. ENSURE STABILIZED ENTRANCES/EXITS ARE USED AND TRACKING OF SOIL IS SWEPT DAILY. |