Permit: T07BU02194
Permit Details
Status:
Final
Type:
COMMERCIAL OTHER
Address:
1465 W SILVERLAKE RD
Address NEW:
1465 W SILVERLAKE RD
Apply Date:
10/16/2007
Applicant:
TYLER ALDRICH
Description:
LUCKY WISHBONE - D06-0039- CUT 0CY FILL 2880CY
Contractors:
- HAZEN LTD , STEVE
Permit Reviews
Permit Number - T07BU02194
Permit Status: Final
Permit Description: LUCKY WISHBONE - D06-0039- CUT 0CY FILL 2880CY
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/19/2010 | REVISION - GRADING | 08/05/2013 | ACTIVE |
| 05/19/2010 | REVISION - GRADING | 05/19/2010 | COMPLETED |
| 08/20/2008 | RESUBMITTAL - GRADING ALL | 09/08/2008 | COMPLETED |
| 09/17/2008 | RESUBMITTAL - GRADING ALL | 10/10/2008 | COMPLETED |
| 10/10/2008 | RESUBMITTAL - GRADING | 12/24/2008 | COMPLETED |
| 10/16/2007 | PLANS OK TO SUBMIT - GRADING | 10/16/2007 | COMPLETED |
| 10/16/2007 | GRADING | 12/18/2007 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T07BU02194
Permit Status: Final
Permit Description: LUCKY WISHBONE - D06-0039- CUT 0CY FILL 2880CY
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 10/16/2007 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: Final
Permit Number: T07BU02194
Permit Description: LUCKY WISHBONE - D06-0039- CUT 0CY FILL 2880CY
Total Completed Inspections - 9
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/13/2009 | ENGINEERING PRE-CONSTRUCTION | MCARREON | Approved | MET WITH ENGINEER, CONTRACTOR, OWNER AND STORMWATER INSTALLATION COMPANY ON SITE. WENT OVER PRE-CON LIST AND APPROVED SET OF PLANS. ADDRESSED ANY CONCERNS AND QUESTIONS. NPPO APPROVAL ALREADY PROVIDED. |
| 11/16/2009 | NPPO PRE PERMIT INSPECTION | ACONNOR | Approved | |
| 12/04/2009 | GRADING - CHECK FOR ACTIVITY | MCARREON | Approved | SPOKE WITH CONTRACTOR REGARDING STORMWATER CONTROLS. |
| 12/11/2009 | STORMWATER INSTALL OF CONTROLS | MCARREON | Approved | CHECK ON SITE AND STORMWATER CONTROLS. DISCUSS CONTRACTORS CONCERNS. |
| 01/25/2010 | STORMWATER FOLLOW-UP INSP | MCARREON | Approved | CHECKED SITE FOR STORMWATER CONCERNS. WEST SIDE CONSTRUCTION ENTRANCE NEEDS TO BE RESTABILIZED. |
| 05/13/2010 | GRADING - INTERMEDIATE | MCARREON | Approved | |
| 05/18/2010 | LANDSCAPE INSPECTION | MCARREON | Approved | ALL LANDSCAPE AND PARKING ISSUES HAVE BEEN RESOLVED. |
| 06/11/2010 | GRADING - FINAL | DROBERTS | Approved | THIS SITE NEEDS TO HAVE THE DRAWINGS CHANGED SO THAT THEY REFLECT ALL MODIFICATIONS THAT HAVE BEEN MADE TO THE SITE THAT ARE APPROVED AND ACCEPTABLE BY BOTH THE ENGINEERING, ZONING, AND LANDSCAPE DEPARTMENTS. WHICH WILL INCLUDE BUT NOT BE LIMITED TO THE CHANGES OF PEDESTRIAN ACCESS, CHAINLINK FENCE INSTALLED WITHIN THE SCZ, MODIFICATIONS TO VEHICULAR ACCESS TO THE RETENTION DETENTION BASIN, ADDITIONAL DUMPSTER NOTED ON THE SITE THAT IS PLACED OUTSIDE OF THE APPROVED DUMPSTER ENCLOSURE, AND DISTURBANCES TO THE NATURAL VEGETATION WITHIN THE SCZ CORRIDOR AND BUFFER ZONES. |
| 04/27/2015 | PERMIT FINALED | DROBERTS | Approved |