Permit: T07BU01366
Permit Details
Apply Date:
06/21/2007
Applicant:
ME ENGINEERING TECHNOLOGY
Description:
GRADING:780CY CUT 7429 CY FILL
Contractors:
- LANG WYATT CONSTRUCTION ,
Outstanding Activity Conditions
Permit Number - T07BU01366
Permit Status: Final
Permit Description: GRADING:780CY CUT 7429 CY FILL
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 06/21/2007 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: Final
Permit Number: T07BU01366
Permit Description: GRADING:780CY CUT 7429 CY FILL
Total Completed Inspections - 5
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/27/2007 | STORMWATER INSTALL OF CONTROLS | MAVERY | Approved | Contractor needs to wattle per detail. (stake every 3 to 4 feet) |
| 08/27/2007 | ENGINEERING PRE-CONSTRUCTION | MAVERY | Approved | Completed pre-con. |
| 11/16/2007 | STORMWATER FOLLOW-UP INSP | MAVERY | Approved | Contractor needs to address concrete washout. Contractor getting ready to place concrete for floors and footers. I told Gregg he needs to provide a washout area per SWPPP plan. Gregg also told me he has not addressed HC ramp with engineer. |
| 12/16/2008 | GRADING - FINAL | MAVERY | Approved | Completed meeting for revisions to drawings. Contractor need to provide new drawing showing new basin on southwest corner. |
| 01/19/2010 | PERMIT FINALED | JFEMLING | Approved |