Inspection Status: Approved
Inspection History: STORMWATER FOLLOW-UP INSP
| Date |
Description |
Inspector |
Results |
Comments |
| 01/06/2010 |
STORMWATER FOLLOW-UP INSP |
|
Approved |
All areas stabilized. |
| 04/16/2008 |
STORMWATER FOLLOW-UP INSP |
|
Correction Required |
Contractor needs to install controls around mixer. Spoke to Gregg in regards to. |
| 03/13/2008 |
STORMWATER FOLLOW-UP INSP |
|
Partial Approval |
Contractor cleaned up wash out around site. contractor site needs to obtain copy of grading plan. |
| 03/05/2008 |
STORMWATER FOLLOW-UP INSP |
|
Partial Approval |
Contractor needs to clean up wash out around site. |
| 11/16/2007 |
STORMWATER FOLLOW-UP INSP |
|
Partial Approval |
Contractor needs to address concrete washout. Contractor getting ready to place concrete for floors and footers. I told Gregg he needs to provide a washout area per SWPPP plan. Gregg also told me he has not addressed HC ramp with engineer. |
| 10/16/2007 |
STORMWATER FOLLOW-UP INSP |
|
Partial Approval |
Contractor needs to un-cover wattle on northeast corner of site. Basin looks deeper then 24 inchs, Explained if Gregg if side slopes are steeper then 4 to 1 and depth of basin is more then 24" a safety barrier will need to be installed. |
| 09/13/2007 |
STORMWATER FOLLOW-UP INSP |
|
Partial Approval |
Met with Gregg on site went over re-fee policy and SWPPP requirements for inspections. |
| 09/11/2007 |
STORMWATER FOLLOW-UP INSP |
|
Partial Approval |
Contractor needs to make minor repairs to wattle and keep track out cleaned up. |