Inspection History Details
Inspection Status: Approved
Inspection History: STORMWATER FOLLOW-UP INSP
Permit Number - T07BU01366
Inspection Description - STORMWATER FOLLOW-UP INSP
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/06/2010 | STORMWATER FOLLOW-UP INSP | Approved | All areas stabilized. | |
04/16/2008 | STORMWATER FOLLOW-UP INSP | Correction Required | Contractor needs to install controls around mixer. Spoke to Gregg in regards to. | |
03/13/2008 | STORMWATER FOLLOW-UP INSP | Partial Approval | Contractor cleaned up wash out around site. contractor site needs to obtain copy of grading plan. | |
03/05/2008 | STORMWATER FOLLOW-UP INSP | Partial Approval | Contractor needs to clean up wash out around site. | |
11/16/2007 | STORMWATER FOLLOW-UP INSP | Partial Approval | Contractor needs to address concrete washout. Contractor getting ready to place concrete for floors and footers. I told Gregg he needs to provide a washout area per SWPPP plan. Gregg also told me he has not addressed HC ramp with engineer. | |
10/16/2007 | STORMWATER FOLLOW-UP INSP | Partial Approval | Contractor needs to un-cover wattle on northeast corner of site. Basin looks deeper then 24 inchs, Explained if Gregg if side slopes are steeper then 4 to 1 and depth of basin is more then 24" a safety barrier will need to be installed. | |
09/13/2007 | STORMWATER FOLLOW-UP INSP | Partial Approval | Met with Gregg on site went over re-fee policy and SWPPP requirements for inspections. | |
09/11/2007 | STORMWATER FOLLOW-UP INSP | Partial Approval | Contractor needs to make minor repairs to wattle and keep track out cleaned up. |