Permit: T07BU01366

Parcel: 140430130


Addresses:

2747 E AIRPORT DR

Inspection Status: Approved

Inspection History: GRADING - FINAL

Date Description Inspector Results Comments
01/19/2010 GRADING - FINAL Approved Received as-built and cert letters, project approved.
01/06/2010 GRADING - FINAL Partial Approval All items on punch list dated 11/26/08 are complete except for item 14 and 21. Contractor will check with owner regarding strippping of parking areas inside fenced yard.
12/16/2008 GRADING - FINAL Denied Completed meeting for revisions to drawings. Contractor need to provide new drawing showing new basin on southwest corner.
12/15/2008 GRADING - FINAL Denied Engineer no show for meeting.
12/04/2008 GRADING - FINAL Correction Required Contractor called for a temp C of O. I explained to contractor he would need to call the inspection in through the IVR system.
11/26/2008 GRADING - FINAL Denied PRELIM PUNCH LIST. CONTRACTOR NEEDS TO ADDRESS ITEMS AND CALL IN FOR RE-INSPECTION.
1- Complete all grading activity.
2- Provide site cert from engineer, per C.O.T. D.M. chapter XIV, section 14.2(7).
3- Pin down all wheel stops.
4- Provide wheel stops for north building parking.
5- Stabilize all areas distrubed by construction.
6- Complete all sidewalk work.
7- Complete retention/detention basin.
8- Complete all drainage and drainage structures.
9- Install all bollers for trash enclosures.
10- Clean all wash out on site.
11- Grade basin to drain.
12- Have engineer address all slopes steeper then 3 to 1.
13- Keep all SWPPP controls in working order until all areas stabilized.
14- Engineer needs to provide approved revised drawing showing all changes to drainage.
15- Address all erosion on site.
16- Complete all construction around building.
17- Backfill all open holes.
18- Remove all port-a-pottys from site.
19- Address holes southwest corner of project.
20- Install all traffic islands.
21- Complete all striping.
22- Complete outlet for basin, per approved drawings.
11/24/2008 GRADING - FINAL Correction Required Spoke to Gregg site super, contractor needs to call in inspection so a punch list can be worked up for temp C of O.
06/05/2008 GRADING - FINAL Partial Approval Contractor patched road, Gregg to provide compaction test (2) for cuts.
06/03/2008 GRADING - FINAL Partial Approval Contractor dug across road. Contractor needs to provide me a copy of all compaction test.
10/16/2007 GRADING - FINAL Partial Approval Contractor need to have engineer address HC ramp that extends into access aisle. Spoke to Gregg in regards to.
08/27/2007 GRADING - FINAL Denied Contractor needs to complete all work before final grading is approved.
08/23/2007 GRADING - FINAL Correction Required Issued Stop Work Order. Best Paving on site grading with no SWPPP controls installed. Contractor did not call in for pre-construction inspections. This is the 4th. time Best Paving started grading work with no controls installed.