Permit Details

Status:
Final
Type:
COMMERCIAL OTHER
Apply Date:
06/21/2007
Applicant:
ME ENGINEERING TECHNOLOGY
Description:
GRADING:780CY CUT 7429 CY FILL
Contractors:
  • LANG WYATT CONSTRUCTION ,

Permit Reviews

Permit Number - T07BU01366
Permit Status: Final
Permit Description: GRADING:780CY CUT 7429 CY FILL
Start Date Submittal Complete Date Status  
01/14/2010 REVISION - GRADING 04/11/2017 COMPLETED Review Details
06/21/2007 PLANS OK TO SUBMIT - GRADING 06/21/2007 COMPLETED Review Details
06/21/2007 GRADING 07/31/2007 COMPLETED Review Details
08/18/2009 REVISION - GRADING 08/18/2009 COMPLETED Review Details
08/18/2009 REVISION - GRADING 12/29/2009 COMPLETED Review Details
12/03/2008 REVISION - GRADING 12/31/2008 COMPLETED Review Details
12/31/2008 REVISION - GRADING 01/08/2009 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T07BU01366
Permit Status: Final
Permit Description: GRADING:780CY CUT 7429 CY FILL
Total Outstanding Activity Conditions - 1
Date Name
06/21/2007 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.

Completed Inspections

Permit Status: Final
Permit Number: T07BU01366
Permit Description: GRADING:780CY CUT 7429 CY FILL
Total Completed Inspections - 5
Date Description Inspector Results Comments
08/27/2007 STORMWATER INSTALL OF CONTROLS MAVERY Approved Contractor needs to wattle per detail. (stake every 3 to 4 feet)
08/27/2007 ENGINEERING PRE-CONSTRUCTION MAVERY Approved Completed pre-con.
11/16/2007 STORMWATER FOLLOW-UP INSP MAVERY Approved Contractor needs to address concrete washout. Contractor getting ready to place concrete for floors and footers. I told Gregg he needs to provide a washout area per SWPPP plan. Gregg also told me he has not addressed HC ramp with engineer.
12/16/2008 GRADING - FINAL MAVERY Approved Completed meeting for revisions to drawings. Contractor need to provide new drawing showing new basin on southwest corner.
01/19/2010 PERMIT FINALED JFEMLING Approved