Permit: T06CM03833
Permit Details
Apply Date:
06/29/2006
Applicant:
SIERRA PACIFIC COMPANY L L C ,
Description:
SFR:TD#16-51-41 T05-M0271
Contractors:
- SIERRA PACIFIC COMPANY L L C ,
Permit Reviews
Permit Number - T06CM03833
Permit Status: C of o
Permit Description: SFR:TD#16-51-41 T05-M0271
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
06/29/2006 | RESIDENTIAL BLDG-MODEL PLAN/ENGINE/WALK THRU | 06/29/2006 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T06CM03833
Permit Status: C of o
Permit Description: SFR:TD#16-51-41 T05-M0271
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
06/29/2006 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: C of o
Permit Number: T06CM03833
Permit Description: SFR:TD#16-51-41 T05-M0271
Total Completed Inspections - 26
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/04/2006 | ELECTRIC - UFER | JRIVA | Approved | IVRS - Inspection :* |
08/04/2006 | BUILDING PRE-SLAB | JRIVA | Approved | IVRS - Inspection :* |
08/04/2006 | EXCAVATION/LAYOUT REBAR & ZON | JRIVA | Approved | IVRS - Inspection :* |
08/04/2006 | PLUMBING - SEWER HCS CONNECT | JRIVA | Approved | IVRS - Inspection :* |
08/04/2006 | PLUMBING - YARD WTR LINE/TEST | JRIVA | Approved | IVRS - Inspection :* |
08/04/2006 | PLUMBING - ROUGH, SOIL | JRIVA | Approved | IVRS - Inspection :* |
10/11/2006 | ROOF NAILING | CRUIZ | Approved | IVRS - Inspection :* |
11/01/2006 | EXT METAL CLIPS/EXT SHEATHING | JRIVA | Approved | IVRS - Inspection :* 1) ITEMS 4 AND 6 NOT DONE 2) HAVE PLAN CHANGES APPROVED BY CITY OF TUCSON 3) HOUSE OK TO DRY IN |
11/27/2006 | U VALUE FOR WINDOW | CTREVILL | Approved | IVRS - Inspection : See detailed listing on site.| 999* |
11/30/2006 | FRAMING | JRIVA | Approved | IVRS - Inspection : See detailed listing on site.| 999* 1) LATHE NOT COMPLETE FRONT OVER PATIO 2) SEAL ALL LATHE PENETRATIONS 3) FLOOR TRUSS IN GARAGE TOP CHORD CUT BY PLUMBING. PROVIDE CITY OF TUCSON APPROVED TRUSS REPAIR DOCUMENT 4) PLAN CALLS FOR FLOR TRUSSES AT 16" ON CENTER INSTALLED AT 24" ON CENTER. BUILD TO PLAN OR REVERSE PLAN TO AS BUILT 5) 4 X 12 BEAM CARRING FLOOR TRUSSES IS NOT ON PLAN. REVISE PLAN. WHAT IS IT TO BEAR ON ? 6) STAIR HEADER TRUSS CUT. PROVIDE CITY OF TUCSON APPROVED ENGINGEERING REPAIR 7) PROVIDE APPROVED TRUSS DRAWINGS 8) STAIRS EXCEED 7 3/4" RISE 9) STOPPED INSPECTION-TOO MANY ITEMS |
11/30/2006 | PLUMBING - GAS PRESSURE TEST | JRIVA | Approved | IVRS - Inspection : See detailed listing on site.| 999* |
11/30/2006 | MECHANICAL - INTERMEDIATE | JRIVA | Approved | IVRS - Inspection : See detailed listing on site.| 999* |
11/30/2006 | PLUMBING - INTERMEDIATE | JRIVA | Approved | IVRS - Inspection : See detailed listing on site.| 999* |
11/30/2006 | ELECTRIC - INTERMEDIATE | JRIVA | Approved | IVRS - Inspection : See detailed listing on site.| 999* |
11/30/2006 | STUCCO MESH | JRIVA | Approved | IVRS - Inspection : See detailed listing on site.| 999* |
02/20/2007 | SHEET ROCK NAILING | EDURAZO | Approved | IVRS - Inspection :* |
04/05/2007 | ELECTRIC - TEMPORARY SERVICE | JRIVA | Approved | IVRS - Inspection :* |
04/05/2007 | ELECTRIC - CABLE DROP | JRIVA | Approved | IVRS - Inspection :* |
05/16/2007 | TEP CLEARANCE - AM | JWEATHER | Approved | ECO CLEARED PER J. RIVA |
11/06/2007 | BUILDING - FINAL | JRIVA | Approved | IVRS - Inspection : Work is not complete enough to inspect.| 950* 1) SECURE A/C CONDENSOR FLEX CONDUIT WITHIN 12" OF DISCONNECT 2) PROVIDE POST TENSION TAG AT WATER SHUT OFF VALVE 3) REPAIR DAMAGED WIRE AND LABEL IRRIGATION CIRCUIT 4) IMPROPER COLOR CODE OF A/C WIRES WHITE CANNOT BE HOT 5) NO REAR PORCH LIGHT OR BALCONY LIGHT 6) BALCONY DRAIN CANNOT HAVE OPENING GREATER THAN 4" 7) PROVIDE 1/4" PER FOOT PITCH ON A/C DRAIN PAN 8) SECURE FURNACE WHIP WITHIN 12" OF DISCONNECT 9) WIRE COLOR CODE WRONG 10) SECURE WIRE WITHIN 8" OF DISCONNECT 11) MARK FAU HEAT STRIP LABEL 12) STOPPED INSPECTION-TO MANY ITEMS 13) NO PLAN ON SITE |
11/06/2007 | MECHANICAL - FINAL | JRIVA | Approved | IVRS - Inspection : Work is not complete enough to inspect.| 950* |
11/06/2007 | PLUMBING - FINAL | JRIVA | Approved | IVRS - Inspection : Work is not complete enough to inspect.| 950* |
11/06/2007 | ELECTRIC - FINAL | JRIVA | Approved | IVRS - Inspection : Work is not complete enough to inspect.| 950* |
03/18/2010 | PLUMBING - GAS PRESS TEST FNL | RFREIDIN | Approved | |
03/18/2010 | OUTDOOR LIGHTING FINAL | RFREIDIN | Approved | |
03/18/2010 | ELECTRIC - OUTDOOR LIGHTING | RFREIDIN | Approved |