Permit: T06CM03670
Permit Details
Apply Date:
06/21/2006
Applicant:
SIERRA PACIFIC COMPANY L L C ,
Description:
SFR:TD# 16-53-70
Contractors:
- SIERRA PACIFIC COMPANY L L C ,
Permit Reviews
Permit Number - T06CM03670
Permit Status: C of o
Permit Description: SFR:TD# 16-53-70
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
06/21/2006 | RESIDENTIAL BLDG-MODEL PLAN/ENGINE/WALK THRU | 06/29/2006 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T06CM03670
Permit Status: C of o
Permit Description: SFR:TD# 16-53-70
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
06/21/2006 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: C of o
Permit Number: T06CM03670
Permit Description: SFR:TD# 16-53-70
Total Completed Inspections - 23
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/17/2006 | PLUMBING - ROUGH, SOIL | JRIVA | Approved | IVRS - Inspection :* 1) REVISE EXISTING PLAN TO CHANGE MAIN DRAIN TO 3" 2) PROVIDE A PLAN FOR EACH MODEL FOR DUEL TRUNK DRAIN SYSTEM WITH FIRST AND SECOND FLOOR DRAINS ON SEPERATE SYSTEMS WHEN BACK WATER VALVES ARE NEEDED |
07/17/2006 | PLUMBING - SEWER HCS CONNECT | JRIVA | Approved | IVRS - Inspection :* |
07/21/2006 | ELECTRIC - UFER | RFREIDIN | Approved | IVRS - Inspection :* 1) UFER BENT REBAR UP FROM SLAB |
07/21/2006 | BUILDING PRE-SLAB | RFREIDIN | Approved | IVRS - Inspection :* |
07/21/2006 | EXCAVATION/LAYOUT REBAR & ZON | RFREIDIN | Approved | IVRS - Inspection :* |
09/27/2006 | ROOF NAILING | CRUIZ | Approved | IVRS - Inspection :* |
11/13/2006 | U VALUE FOR WINDOW | CRUIZ | Approved | IVRS - Inspection :* |
11/13/2006 | STUCCO MESH | CRUIZ | Approved | IVRS - Inspection :* |
11/14/2006 | EXT METAL CLIPS/EXT SHEATHING | WNORTH | Approved | IVRS - Inspection :* 1) DONE ACCORDING TO PRIOR NOTES PENDING CITY OF TUCSON APPROVAL 2) OK TO INSULATE |
11/14/2006 | PLUMBING - GAS PRESSURE TEST | WNORTH | Approved | IVRS - Inspection :* |
11/14/2006 | MECHANICAL - INTERMEDIATE | WNORTH | Approved | IVRS - Inspection :* |
11/14/2006 | PLUMBING - INTERMEDIATE | WNORTH | Approved | IVRS - Inspection :* |
12/01/2006 | FRAMING | JRIVA | Approved | IVRS - Inspection : See detailed listing on site.| 999* 1) HOUSE NOT BUILT IN ACCORDANCE WITH THE APPROVED PLAN AND THE ENGINEER MET ME ON SITE AND DISCUSSED WHAT CHANGES HE WANTED MADE. A PARTIAL APPROVAL WAS GIVEN TO DRY IN THE HOUSE PENDING CITY OF TUCSON APPROVAL OF ENGINEERS REVISION. TO DATE THE REVISION HAS NOT BEEN APPROVED. YOU MAY NEED TO REMOVE SOME DRY WALL IF CITY REVISION DOES NOT COMPLY WITH THE ENGINEERS ORIGINAL CHANGES |
12/01/2006 | SHEET ROCK NAILING | JRIVA | Approved | IVRS - Inspection : See detailed listing on site.| 999* |
02/14/2007 | ELECTRIC - TEMPORARY SERVICE | CTREVILL | Approved | IVRS - Inspection :* |
02/14/2007 | ELECTRIC - CABLE DROP | CTREVILL | Approved | IVRS - Inspection :* |
02/15/2007 | TEP CLEARANCE - AM | JWEATHER | Approved | ECO CLEARED PER C. TREVILLYAN |
04/17/2007 | MECHANICAL - FINAL | WLAHR | Approved | IVRS - Inspection :* |
04/17/2007 | PLUMBING - FINAL | WLAHR | Approved | IVRS - Inspection :* |
04/17/2007 | ELECTRIC - FINAL | WLAHR | Approved | IVRS - Inspection :* |
04/18/2007 | PLUMBING - YARD WTR LINE/TEST | WLAHR | Approved | |
04/18/2007 | BUILDING - FINAL | WLAHR | Approved | IVRS - Inspection :* |
05/01/2007 | PERMIT FINALED | JWEATHER | Approved |