Inspection History Details
Inspection Status: Approved
Inspection History: EXT METAL CLIPS/EXT SHEATHING
Permit Number - T06CM03670
Inspection Description - EXT METAL CLIPS/EXT SHEATHING
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/16/2007 | EXT METAL CLIPS/EXT SHEATHING | Approved | IVRS - Inspection :* | |
01/09/2007 | EXT METAL CLIPS/EXT SHEATHING | Not ready for Inspection | IVRS - Inspection :* 1) NOT READY PER CEASAR |
|
11/14/2006 | EXT METAL CLIPS/EXT SHEATHING | Partial Approval | IVRS - Inspection :* 1) DONE ACCORDING TO PRIOR NOTES PENDING CITY OF TUCSON APPROVAL 2) OK TO INSULATE |
|
11/13/2006 | EXT METAL CLIPS/EXT SHEATHING | Partial Approval | IVRS - Inspection :* | |
11/01/2006 | EXT METAL CLIPS/EXT SHEATHING | Partial Approval | IVRS - Inspection :* 1) NO CHANGE FROM 10/30/06 2) OK TO DRY IN |
|
10/30/2006 | EXT METAL CLIPS/EXT SHEATHING | Partial Approval | IVRS - Inspection :* 1) ITEMS 2, 3, 4 & 5 NOT DONE FROM INSPECTION OF 10-26-06 2) OK TO DRY IN PENDING PLAN REVISION APPROVAL BY CITY OF TUCSON |
|
10/26/2006 | EXT METAL CLIPS/EXT SHEATHING | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) SECOND FLOOR MISSING 4 EACH HTT22 WITH 5/8" BOLT HOLDOWN 2) 2 EACH PAHD 42 HOLDOWNS MISSING S.E. CORNER 3) TWO EACH PAHD42 HOLDOWNS MISSING WEST OF PATIO DOOR 4) SHEAR NOT PER REVISED PLAN 5) HAVE REVISED PLAN APPROVED BY CITY OF TUCSON |
|
10/20/2006 | EXT METAL CLIPS/EXT SHEATHING | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) EAST 2ND FLOOR MIDDLE SW 5 WRONG LOCATION 2) THE SHEARWALL DESIGN ON THE PLAN DOES NOT COMPLY WITH AS BUILT DESIGN AND STRUCTURE. HAVE ENGINEER EVALUATE FIRST AND SECOND FLOOR SHEAR ALIGNMENT TO COMPLY WITH 4 & 5/S2.1 |
|
10/19/2006 | EXT METAL CLIPS/EXT SHEATHING | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) 2ND FLOOR SHEAR EAST SIDE CENTER IN WRONG LOCATION 2) SHEAR SCHEDULE DOES NOT SPECIFY FIELD NAILING SO IT IS ASSUMED TO BE SAME SPACING AS EDGES 3) CLARIFY PLAN-CALLS FOR (SP8) AT SECOND FLOOR ON PAGE S-2.1 |
|
09/22/2006 | EXT METAL CLIPS/EXT SHEATHING | Not ready for Inspection | IVRS - Inspection :* 1) NOT READY PER SUPER |