Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: T06CM03499
Permit Details
Apply Date:
06/13/2006
Applicant:
LEN MCENERY
Description:
CARWASH
Contractors:
- LANG WYATT CONSTRUCTION ,
Permit Reviews
Permit Number - T06CM03499
Permit Status: Final
Permit Description: CARWASH
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
01/04/2008 | POST 3RD PARTY REVIEW | 01/08/2008 | COMPLETED |
01/08/2008 | RESUBMITTAL | 01/09/2008 | COMPLETED |
06/13/2006 | 3RD PARTY REVIEW-COMMERCIAL | 06/22/2006 | COMPLETED |
06/22/2006 | POST 3RD PARTY REVIEW | 06/26/2006 | COMPLETED |
07/03/2006 | RESUBMITTAL | 07/21/2006 | COMPLETED |
07/10/2006 | RESUBMITTAL | 07/21/2006 | COMPLETED |
11/20/2007 | 3RD PARTY REVIEW-REVISION/OTHER | 11/29/2007 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T06CM03499
Permit Status: Final
Permit Description: CARWASH
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
06/13/2006 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: Final
Permit Number: T06CM03499
Permit Description: CARWASH
Total Completed Inspections - 30
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/12/2007 | ELECTRIC - UFER | RJIROUDE | Approved | IVRS - Inspection :* 1. OK 3/0 COPPER TO REBAR IN FOOTING 2. NEC 225.30 ALLOWS ONLY ONE FEEDER TO ADDITIONAL BUILDING SERVED ON LOAD SIDE OF SERVICE DISCONNECT 3. 225.31 & 225.32 REQUIRES DISCONNECT FOR FEEDER TO OTHER BUILDING & REQUIRES THIS DISCONNECT TO BE LOCATED INSIDE OR OUTSIDE OF BUILDING SERVED |
09/17/2007 | STEM WALL/RETAINING WALL | GDABBS | Approved | IVRS - Inspection :* STEM WALLS @ CAR WASH |
09/25/2007 | PLUMBING - BACK WATER VALVE | RRICH | Approved | IVRS - Inspection :* |
09/25/2007 | PLUMBING - SEWER HCS CONNECT | RRICH | Approved | IVRS - Inspection :* |
10/01/2007 | ELECTRIC - UNDERGROUND | RJIROUDE | Approved | IVRS - Inspection :* 1. AS DISCUSSED WITH LINDA BUCZYNSKI 2 FEEDERS TO SECOND BUILDING IS OK AS LONG AS WE HAVE DISCONNECTING MEANS AT SECOND BUILDING & THEY ARE GROUPED. 2. OK UNDERGROUND INSIDE CARWASH BUILDING |
10/01/2007 | PLUMBING - ROUGH, SOIL | RRICH | Approved | IVRS - Inspection :* |
10/08/2007 | BUILDING PRE-SLAB | GDABBS | Approved | IVRS - Inspection :* PRE-SLAB @ CARWASH |
10/08/2007 | PLUMBING - PRE SLAB | RRICH | Approved | IVRS - Inspection :* |
11/02/2007 | EXCAVATION/LAYOUT REBAR & ZON | GDABBS | Approved | IVRS - Inspection :* MONUMENT SIGN FOOTING @ N/W CORNER |
11/06/2007 | SITE - SEWER | RRICH | Approved | IVRS - Inspection :* |
11/08/2007 | FRAMING | GDABBS | Approved | IVRS - Inspection :* |
11/09/2007 | ROOF NAILING | GDABBS | Approved | IVRS - Inspection :* |
11/14/2007 | REINFORCED MASONRY PRE-GROUT | GDABBS | Approved | IVRS - Inspection :* MONUMENT SIGN BASE - TOP OUT |
11/21/2007 | PLUMBING - GAS PRESSURE TEST | RRICH | Approved | IVRS - Inspection :* |
11/21/2007 | PLUMBING - YARD WTR LINE/TEST | RRICH | Approved | IVRS - Inspection :* |
11/28/2007 | PLUMBING - INTERMEDIATE | RRICH | Approved | IVRS - Inspection :* |
12/24/2007 | OUTDOOR LIGHTING FINAL | DSANTACR | Approved | IVRS - Inspection : See detailed listing on site.| 999* |
12/26/2007 | SIGN - FINAL | JSONKIN | Approved | TEMP C/O; NEED SIGN SHOP AND SIGN ELECTRIC INSPECTION OF ILLUMINATED SIGNS. |
12/26/2007 | NPPO - FINAL | ACONNOR | Approved | |
12/26/2007 | LANDSCAPE - FINAL | ACONNOR | Approved | |
12/26/2007 | FIRE - FINAL | LTHOMAS | Approved | |
12/26/2007 | ELECTRIC - OUTDOOR LIGHTING | RJIROUDE | Approved | IVRS - Inspection :* |
12/26/2007 | ELECTRIC - INTERMEDIATE | RJIROUDE | Approved | IVRS - Inspection :* |
12/28/2007 | PLUMBING - FINAL | RRICH | Approved | IVRS - Inspection :* 1. PROVIDE SIGNAGE FOR ALL HOSE BIBS & JANITOR SINK, CAUTION: NON-POTABLE WATER DO NOT DRINK PERMANENTLY FIXED TO THESE LOCATIONS 2. PAINT EXPOSED PLASTIC RAIN DRAIN TERMINATIONS |
12/28/2007 | PLUMBING - GAS PRESS TEST FNL | RRICH | Approved | IVRS - Inspection :* POST BOND OR RECEIVE GAS CLEARANCE CARD FROM FINAL BLD. INSPECTOR |
12/28/2007 | ENGINEERING - FINAL | NKALAHAR | Approved | NOT READY CONCERNS ON SIDEWALK AT SE CORNER OF SITE THAT CONNECTS THIS PROJECT WITH THE REST OF THE CENTER |
01/16/2008 | RIGHT OF WAY - FINAL | MCASTRO | Approved | PER EMAIL |
01/16/2008 | ELECTRIC - FINAL | RJIROUDE | Approved | IVRS - Inspection :* |
01/17/2008 | BUILDING - FINAL | GDABBS | Approved | IVRS - Inspection :* |
01/17/2008 | STUCCO MESH | GDABBS | Approved | IVRS - Inspection :* |