Permit Details

Status:
Final
Type:
COMMERCIAL ALTERATION
Address:
1545 E COPPER ST
Address NEW:
1545 E COPPER ST
Apply Date:
02/21/2006
Applicant:
STICKLEY DESIGN GROUP
Description:
TI:LAB:BATHROOM
Contractors:
  • DIVERSIFIED DESIGN AND CONSTRUCT

Permit Reviews

Permit Number - T06CM01058
Permit Status: Final
Permit Description: TI:LAB:BATHROOM
Start Date Submittal Complete Date Status  
02/21/2006 PLANS OK TO SUBMIT - 3RD PARTY 02/21/2006 COMPLETED Review Details
02/21/2006 3RD PARTY REVIEW-COMMERCIAL TI 04/05/2006 COMPLETED Review Details
04/05/2006 POST 3RD PARTY REVIEW 04/25/2006 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T06CM01058
Permit Status: Final
Permit Description: TI:LAB:BATHROOM
Total Outstanding Activity Conditions - 1
Date Name
02/21/2006 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.

Completed Inspections

Permit Status: Final
Permit Number: T06CM01058
Permit Description: TI:LAB:BATHROOM
Total Completed Inspections - 23
Date Description Inspector Results Comments
07/20/2006 FRAMING AQUIROZ Approved IVRS - Inspection :*
07/25/2006 PLUMBING - GAS PRESSURE TEST RMYERS Approved IVRS - Inspection :*
1. OK TO COVER ALL AREAS
2. GAS PRESSURE TEST OK
CONTRACTOR TO REDLINE CHANGES
07/25/2006 PLUMBING - INTERMEDIATE RMYERS Approved IVRS - Inspection :*
07/25/2006 PLUMBING - INTERMEDIATE RMYERS Approved IVRS - Inspection :*
1. VENTS TO BE INSTALLED LEVEL OR SO DESIGNED AS TO DRAIN BACK TO THE ORIGINATING FIXTURE (BACK PITCH NOT PERMITTED).
2. DRAINAGE PIPING TO BE INSTALLED AT 2% PITCH
3. SUPPORT OVERHEAD HORIZONTAL VENT
4. HAVE 03050 GAS PRESSURE TEST ADDED TO YOUR PERMIT AND CALL TEST UNDER THIS CODE.
08/08/2006 MECHANICAL - ABOVE CEILING CWILLIAM Approved IVRS - Inspection :*
1. OK TO SET TILES
2. COMPLETE CONDENSERS
I.D CONDENSERS W/MATCHING A/H
08/08/2006 PLUMBING - ABOVE CEILING RMYERS Approved IVRS - Inspection :*
08/08/2006 MECHANICAL - FINAL CWILLIAM Approved IVRS - Inspection :*
08/08/2006 SHEET ROCK NAILING AQUIROZ Approved IVRS - Inspection :*
08/08/2006 BUILDING ABOVE CEILING AQUIROZ Approved IVRS - Inspection :*
08/10/2006 ELECTRIC - FINAL CCLEMENS Approved IVRS - Inspection :*
1. CIRCUITRY APPEARS TO HAVE BEEN CHANGED AS PER PLAN ALSO, PNL CL DIRECTORY NOT AS PER PLAN.
2. PROPERLY SUPPORT ALL COMMUNICATIONS WIRING ABOVE CEILING SOME HANGING THRU CEILING.
3. MISSING DEVICE COVER WEST WALL & SOME MISSING J-BOX COVERS UNDER DESKS.
4. ALL GFI'S TO BE WORKING PROPERLY
5. SUPPORT LOOSE MC CABLE UNDER DESK
6. PROPERLY CLOSE OFF OPEN WIRING IN CHEM STORAGE
7. FINISH AUTO FLUSH DEVICE MEN'S TOILETS.
08/10/2006 ELECTRIC - CONSTRUCTION POWER CCLEMENS Approved IVRS - Inspection :*
08/10/2006 ELECTRIC - ABOVE CEILING CCLEMENS Approved IVRS - Inspection :*
08/10/2006 ELECTRIC - INTERMEDIATE CCLEMENS Approved IVRS - Inspection :*
08/10/2006 FIRE - FINAL LTHOMAS Approved
08/14/2006 BUILDING - FINAL GDABBS Approved IVRS - Inspection :*
PENDING PLUMBING & MECH. FINALS APPROVED
10/20/2006 PLUMBING - FINAL RLEDONNE Approved IVRS - Inspection :*
10/20/2006 NPPO - FINAL ACONNOR Approved N/A
10/20/2006 LANDSCAPE - FINAL ACONNOR Approved N/A
10/20/2006 SIGN - FINAL JYBARRA Approved
10/23/2006 ENGINEERING - FINAL MRUSSO Approved
10/24/2006 RIGHT OF WAY - FINAL MOTERO Approved
10/24/2006 PERMIT FINALED DROBEY Approved
10/24/2006 MECHANICAL - INTERMEDIATE CWILLIAM Approved

Documents

File Name Document Type  
None LETTER OF COMPLETION VIEW
None DOCUMENTS VIEW