Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
C of o
Type:
COMMERCIAL OTHER
Apply Date:
02/17/2006
Applicant:
MILLER BUILDER , JOHN WESLE
Description:
TUCSON BOTANICAL GARDENS PAVILION
Contractors:
  • MILLER BUILDER , JOHN WESLE

Permit Reviews

Permit Number - T06CM01007
Permit Status: C of o
Permit Description: TUCSON BOTANICAL GARDENS PAVILION
Start Date Submittal Complete Date Status  
02/17/2006 COMMERCIAL-BLDG/FIRE/ZONING/ENG 05/19/2006 COMPLETED Review Details
05/19/2006 3RD PARTY REVIEW-COMMERCIAL 05/23/2006 COMPLETED Review Details
05/23/2006 POST 3RD PARTY REVIEW 05/24/2006 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T06CM01007
Permit Status: C of o
Permit Description: TUCSON BOTANICAL GARDENS PAVILION
Total Outstanding Activity Conditions - 1
Date Name
02/17/2006 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.

Completed Inspections

Permit Status: C of o
Permit Number: T06CM01007
Permit Description: TUCSON BOTANICAL GARDENS PAVILION
Total Completed Inspections - 18
Date Description Inspector Results Comments
08/21/2006 BUILDING PRE-SLAB JBURGE Approved IVRS - Inspection :*
OK TO POUR
08/21/2006 EXCAVATION/LAYOUT REBAR & ZON JBURGE Approved IVRS - Inspection :*
11/13/2006 ROOF NAILING JBURGE Approved IVRS - Inspection :*
OK TO APPLY METAL ROOF SYSTEM - PLEASE RECALL WHEN SYSTEM HAS BEEN INSTALLED.
11/13/2006 FRAMING JBURGE Approved IVRS - Inspection :*
11/17/2006 REINFORCED MASONRY PRE-GROUT JBURGE Approved IVRS - Inspection :*
4 @ CORNER UNITS @ 9' -- GROUTED SOLID
12/04/2006 ELECTRIC - INTERMEDIATE RHOLLAND Approved IVRS - Inspection :*
OK WITH CONDUIT RUNS
12/08/2006 ELECTRIC - UNDERGROUND DSANTACR Approved IVRS - Inspection :*
04/18/2007 BUILDING - FINAL JBURGE Approved IVRS - Inspection :*
04/18/2007 SIGN - FINAL JYBARRA Approved IVRS - Inspection :*
04/18/2007 FIRE - FINAL LTHOMAS Approved
04/19/2007 MECHANICAL - FINAL JMILITEL Approved NO MECHANICAL WORK ON THIS PROJECT
04/19/2007 MECHANICAL - INTERMEDIATE JMILITEL Approved
09/04/2007 ELECTRIC - FINAL RHOLLAND Approved IVRS - Inspection :*
OK FINAL
09/04/2007 OUTDOOR LIGHTING FINAL RHOLLAND Approved IVRS - Inspection :*
09/04/2007 ELECTRIC - OUTDOOR LIGHTING RHOLLAND Approved IVRS - Inspection :*
09/04/2007 ELECTRIC - CONSTRUCTION POWER RHOLLAND Approved IVRS - Inspection :*
09/27/2007 ENGINEERING - FINAL GMOYER Approved Per Nancy Laney, Executive Director of TBG, the preliminary development plan attached to the application for the Pavilion was prepared in connection with the entitlement of our property as a cultural use per the special exception approved by Mayor and Council and was intended to reflect a ten year build out of the property. At this time we are only requesting a Certificate of Occupancy for the Pavilion.

All visitor access to the Pavilion (including disable access) is from the interior of the Gardens, so that entry occurs at our Gift Shop/Entrance. Access to the Pavilion is from the south on the path approved by CODI. A direct sidewalk connection from the parking lot to the Pavilion is therefore not appropriate.

I understand the ultimate build out of the Gardens will require submittal and approval of a complete development plan in compliance with the preliminary development plan, the conditions imposed by Mayor and Council with the special exception, and the Land Use Code. This will include but not be limited to accurately reflecting the location of the bike rack, identifying water harvesting features, and paving and reconfiguring the parking lot.
09/27/2007 PERMIT FINALED BGRANT Approved

Documents

File Name Document Type  
C OF O_10-05-2007.TIF CERT OF OCC VIEW
None DOCUMENTS VIEW