Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: T06CM01007
Permit Details
Apply Date:
02/17/2006
Applicant:
MILLER BUILDER , JOHN WESLE
Description:
TUCSON BOTANICAL GARDENS PAVILION
Contractors:
- MILLER BUILDER , JOHN WESLE
Permit Reviews
Permit Number - T06CM01007
Permit Status: C of o
Permit Description: TUCSON BOTANICAL GARDENS PAVILION
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
02/17/2006 | COMMERCIAL-BLDG/FIRE/ZONING/ENG | 05/19/2006 | COMPLETED |
05/19/2006 | 3RD PARTY REVIEW-COMMERCIAL | 05/23/2006 | COMPLETED |
05/23/2006 | POST 3RD PARTY REVIEW | 05/24/2006 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T06CM01007
Permit Status: C of o
Permit Description: TUCSON BOTANICAL GARDENS PAVILION
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
02/17/2006 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: C of o
Permit Number: T06CM01007
Permit Description: TUCSON BOTANICAL GARDENS PAVILION
Total Completed Inspections - 18
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/21/2006 | BUILDING PRE-SLAB | JBURGE | Approved | IVRS - Inspection :* OK TO POUR |
08/21/2006 | EXCAVATION/LAYOUT REBAR & ZON | JBURGE | Approved | IVRS - Inspection :* |
11/13/2006 | ROOF NAILING | JBURGE | Approved | IVRS - Inspection :* OK TO APPLY METAL ROOF SYSTEM - PLEASE RECALL WHEN SYSTEM HAS BEEN INSTALLED. |
11/13/2006 | FRAMING | JBURGE | Approved | IVRS - Inspection :* |
11/17/2006 | REINFORCED MASONRY PRE-GROUT | JBURGE | Approved | IVRS - Inspection :* 4 @ CORNER UNITS @ 9' -- GROUTED SOLID |
12/04/2006 | ELECTRIC - INTERMEDIATE | RHOLLAND | Approved | IVRS - Inspection :* OK WITH CONDUIT RUNS |
12/08/2006 | ELECTRIC - UNDERGROUND | DSANTACR | Approved | IVRS - Inspection :* |
04/18/2007 | BUILDING - FINAL | JBURGE | Approved | IVRS - Inspection :* |
04/18/2007 | SIGN - FINAL | JYBARRA | Approved | IVRS - Inspection :* |
04/18/2007 | FIRE - FINAL | LTHOMAS | Approved | |
04/19/2007 | MECHANICAL - FINAL | JMILITEL | Approved | NO MECHANICAL WORK ON THIS PROJECT |
04/19/2007 | MECHANICAL - INTERMEDIATE | JMILITEL | Approved | |
09/04/2007 | ELECTRIC - FINAL | RHOLLAND | Approved | IVRS - Inspection :* OK FINAL |
09/04/2007 | OUTDOOR LIGHTING FINAL | RHOLLAND | Approved | IVRS - Inspection :* |
09/04/2007 | ELECTRIC - OUTDOOR LIGHTING | RHOLLAND | Approved | IVRS - Inspection :* |
09/04/2007 | ELECTRIC - CONSTRUCTION POWER | RHOLLAND | Approved | IVRS - Inspection :* |
09/27/2007 | ENGINEERING - FINAL | GMOYER | Approved | Per Nancy Laney, Executive Director of TBG, the preliminary development plan attached to the application for the Pavilion was prepared in connection with the entitlement of our property as a cultural use per the special exception approved by Mayor and Council and was intended to reflect a ten year build out of the property. At this time we are only requesting a Certificate of Occupancy for the Pavilion. All visitor access to the Pavilion (including disable access) is from the interior of the Gardens, so that entry occurs at our Gift Shop/Entrance. Access to the Pavilion is from the south on the path approved by CODI. A direct sidewalk connection from the parking lot to the Pavilion is therefore not appropriate. I understand the ultimate build out of the Gardens will require submittal and approval of a complete development plan in compliance with the preliminary development plan, the conditions imposed by Mayor and Council with the special exception, and the Land Use Code. This will include but not be limited to accurately reflecting the location of the bike rack, identifying water harvesting features, and paving and reconfiguring the parking lot. |
09/27/2007 | PERMIT FINALED | BGRANT | Approved |