Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
Permit Number - T06CM01007
Inspection Description - ENGINEERING - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/27/2007 | ENGINEERING - FINAL | Approved | Per Nancy Laney, Executive Director of TBG, the preliminary development plan attached to the application for the Pavilion was prepared in connection with the entitlement of our property as a cultural use per the special exception approved by Mayor and Council and was intended to reflect a ten year build out of the property. At this time we are only requesting a Certificate of Occupancy for the Pavilion. All visitor access to the Pavilion (including disable access) is from the interior of the Gardens, so that entry occurs at our Gift Shop/Entrance. Access to the Pavilion is from the south on the path approved by CODI. A direct sidewalk connection from the parking lot to the Pavilion is therefore not appropriate. I understand the ultimate build out of the Gardens will require submittal and approval of a complete development plan in compliance with the preliminary development plan, the conditions imposed by Mayor and Council with the special exception, and the Land Use Code. This will include but not be limited to accurately reflecting the location of the bike rack, identifying water harvesting features, and paving and reconfiguring the parking lot. |
|
04/26/2007 | ENGINEERING - FINAL | Denied | 1. PROVIDE A REVISED AND C.O.T. APPROVED SITE PLAN THAT SHOWS VEHICULAR PARKING, PEDESTRIAN ACCESS, A.D.A. ACCESS, AND BICYCLE PARKING. 2. PROVIDE RAINWATER HARVEST CISTERNS AS SHOWN ON THE PLAN OR SHOW DRAINAGE ON THE SITE PLAN. THE DIRECTOR OF FACILITIES KEITH CALLAWAY WAS GIVEN COPIES OF THE DEVELOPMENT STANDARDS FOR PEDESTRIAN ACCESS AND VEHICULAR USE AREA DESIGN CRITERIA. |
|
04/23/2007 | ENGINEERING - FINAL | Denied | NOT READY ON SITE MEETING WITH DAVID RIVERA TO OBSERVE PARKING LOT CONSTRUCTION, A.D.A. AND PEDESTRIAN ACCESS. |
|
04/18/2007 | ENGINEERING - FINAL | Denied | NOT READY 1. SITE PLAN HAS HAND WRITTEN HANDICAP/PEDESTRIAN/ACCESS WAYS SHOWN THAT HAVE NOT BEEN PROVIDED. 2. A SOIL STOCKPILE OF EXCAVATED MATERIAL FROM THIS PROJECT IS LOCATED NORTH OF THIS STRUCTURE. 3. CONCRETE WASHOUT NEEDS TO BE CLEANED UP. 4. PARKING LOT IS NOT LAID OUT AS SHOWN ON THE PLAN. 5. FOUR WATER HARVESTING CISTERNS HAVE NOT BEEN INSTALLED. |