Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: T06BU01139
Permit Details
Apply Date:
05/10/2006
Applicant:
MMLA PSOMAS
Description:
GRADING: CUT 920 FILL: 1060
Contractors:
- CANYON BUILDING AND DESIGN L L C
Permit Reviews
Permit Number - T06BU01139
Permit Status: Issued
Permit Description: GRADING: CUT 920 FILL: 1060
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
05/10/2006 | PLANS OK TO SUBMIT - GRADING | 05/10/2006 | COMPLETED |
05/10/2006 | GRADING | 06/15/2006 | COMPLETED |
07/20/2006 | RESUBMITTAL - GRADING ALL | 08/02/2007 | COMPLETED |
08/02/2007 | REVISION - GRADING | 08/03/2007 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T06BU01139
Permit Status: Issued
Permit Description: GRADING: CUT 920 FILL: 1060
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
05/10/2006 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: Issued
Permit Number: T06BU01139
Permit Description: GRADING: CUT 920 FILL: 1060
Total Completed Inspections - 7
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/29/2006 | ENGINEERING PRE-CONSTRUCTION | MRUSSO | Approved | CONSTRUCTION PROJECT HAS NOT BEGUN, HOWEVER THE BLDG PAD IS BEING USED TO STOCKPILE DIRT AND MATERIAL FOR USE ON SITE. SEDIMENT CONTROLS ARE REQUIRED. 1) WADDLE HAS BEEN PLACED AROUND THE PERIMETER OF THE SITE. 2) ENSURE CONTROLS ARE MAITAINED ON A ROUTINE BASIS. 3) SWEEP UP TRACKED MATERIAL AND SOIL ACCUMULATION IN FRONT OF THE ADJACENT STORM WATER CATCH BASIN. 4) STORM WATER CONTROLS MUST REMAIN IN PLACE UNTIL THE SITE IS STABILIZED. |
08/09/2007 | STORMWATER INSTALL OF CONTROLS | MRUSSO | Approved | |
11/15/2007 | STORMWATER FOLLOW-UP INSP | MRUSSO | Approved | PERIMETER OF SITE IS STABILIZED, THEREFORE SEDIMENT CONTROLS HAVE BEEN REMOVED. NO OTHER SITE WORK HAS BEEN COMPLETED. ENSURE SEDIEMNT CONTROLS REMAIN AROUND THE CATCH BASIN LOCATED IN THE SE CORNER OF SITE UNTIL SITE WORK IS DONE. |
02/04/2008 | GRADING - INTERMEDIATE | MRUSSO | Approved | |
02/04/2008 | STORMWATER FINAL INSPECTION | MRUSSO | Approved | |
02/19/2008 | GRADING - FINAL | MRUSSO | Approved | |
05/05/2020 | LANDSCAPE INSPECTION | DROBERTS | Approved |