Inspection History Details
Inspection Status: Approved
Inspection History: STORMWATER INSTALL OF CONTROLS
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/09/2007 | STORMWATER INSTALL OF CONTROLS | Approved | ||
| 05/15/2007 | STORMWATER INSTALL OF CONTROLS | Correction Required | 1) RE-ESTABLISH SEDIMENT CONTROLS AT CATCH BASIN LOCATED ON NE CORNER NEAR PROPERTY BOUNDRY. CLEAN OUT SOIL AND SILT BUILD UP AROUND BASIN. 2) RE-ESTABLISH SEDIMENT CONTROLS ALONG NORTH PERIMETER AT CURB LINE, NEAR STOCKPILED MATERIAL. 3) SWEEP UP TRACKING OFF OF PARKING AREA. 4) MAY REQUIRE A STABILIZED CONSTRUCTION ENTRANCE AS SHOW IN YOUR SWPPPP. CORRECT BY 10 WORKING DAYS - NON-COMPLIANCE WILL RESULT IN A NOTICE OF VIOLATION. 2) |